Haggardstown and Marshes Upper including works on Blackrock Road (R172) and Hardy’s Lane, Dundalk, Co. Louth.
Proposed development
7-year permission for a Large-scale Residential Development (LRD) on lands (c.18.54 ha) The development will consist of:- 502 no. residential units, with a total residential gross floor area of c.51,440.5 sqm comprising:40 no. 1 bed maisonettes,147 no. 2 bed mid-terrace 2 storey house,276 no. 3 bed end of terrace and semi-detached 2 storey houses,1 no. 3 bed detached bungalow and 38 no. 4 bed semi-detached 3 storey houses, 1 no. two storey creche facility (570.7 sqm Gross Floor Area) with outdoor secure play area and parking. New access off Blackrock Road providing for vehicular, pedestrian and cycle access and incorporating a new bus stop on Blackrock Road; 2 no. pedestrian and cycle only access points are provided from Bóthar Maol. Infrastructure and services for the proposed development including surface water infrastructure, water mains and a new wastewater pump station (with temporary storage and associated dosing measures) which will be pumped via a new rising main along Blackrock Road (R172) and Hardy’s Lane to Finnabair Crescent where it will discharge to the existing wastewater drainage network. Associated public and private open space, landscaping and amenity areas including a large central park of c.2.7ha, public art, boundary treatments, public lighting, roads, cycleways, footpaths, car and cycle parking, infrastructure and services and all associated site and development works. To facilitate the proposed development, excavation, cut and fill, reprofiling of existing ground levels and removal of works completed under previously permitted SHD development including the foundations for 5 no. houses is required. The ruins of a former pumphouse will also be removed / demolished as part of the works and existing overhead electrical lines will be undergrounded. *Significant Further Information Received on 14/10/2025*
- Applicant
- Not published
- Authority
- Louth County Council
- Decision due
- 8 Dec 2025
- Residential units
- 462
- Floor area
- 49026.4999999995 m²
Timeline
Application received
30 May 2025
Council asked for further information
22 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
14 Oct 2025
Decision due
8 Dec 2025
Decision: conditional
3 Dec 2025
Appeal decided: refused (ACP-323966-25)
13 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (housing or apartment development) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
housing or apartment development
EXTENSION OF DURATION OF 19590 (ABP-304782-19) - SHD: STAGE 3 Application lodged with An Bord Pleanála (ABP Ref. 304782-19) on 27/6/19 - Stage 2 ref no. 181036.
Blackrock Road, Haggardstown, Blackrock Dundalk · refused 7 Mar 2025 · about 10 m away · 252
housing or apartment development
Permission for 29 no. residential units comprising the following: 2 no. three storey blocks of apartments, comprising 9 no. two bedroom apartments and 3 no. thr
The Loakers, Blackrock Road Bothar Maol, Blackrock Dundalk · refused 28 May 2021 · about 260 m away · 201033
Planning history within 750 m
Large-scale Residential Development (LRD) - Details available on www.haggardstownlrd2026.ie. Permission sought for a 7-year permission on lands (c.18.54 ha) located at Haggardstown and Marshes Upper, Dundalk, including works on Blackrock Road (R172) and Hardy’s Lane/ Finnabair Crescent (L3162). The development will consist of: 502 no. residential units, with a total residential gross floor area of c.51,440.5 sqm comprising: 40 no. 1 bed maisonettes, 147 no. 2 bed mid-terrace 2 storey house, 276 no. 3 bed end of terrace and semi-detached 2 storey houses, 1 no. 3 bed detached bungalow and 38 no. 4 bed semi-detached 3 storey houses. 1 no. two storey creche facility (570.7 sqm Gross Floor Area) with outdoor secure play area and parking. New access off Blackrock Road (R172) providing for vehicular, pedestrian and cycle access and incorporating a new bus stop on Blackrock Road, including horizontal and vertical road realignment; 2 no. pedestrian and cycle only access points are provided from Bóthar Maol. Infrastructure and services for the proposed development including surface water infrastructure, water mains and wastewater infrastructure including an on-site wastewater pump station which will pump wastewater via a new rising main along Blackrock Road (R172) to Hardy’s Lane/ Finnabair Crescent (L3162) where it will discharge to the existing wastewater drainage network. Interim measures are proposed on site (pending completion of upgrade works by Uisce Éireann to the Coes Road pumping station) comprising temporary storage and associated dosing measures within the emergency storage tank for daytime storage once discharge exceeds 61m3 (approximately 200 units). Associated public and private open space, landscaping and amenity areas including a large central park of c.2.7ha, public art, boundary treatments, public lighting, roads, cycleways, footpaths, car and cycle parking, infrastructure and services and all associated site and development works. To facilitate the proposed development, excavation, cut and fill, reprofiling of existing ground levels and removal of works completed under previously permitted SHD development including the foundations for 5 no. houses is required. The ruins of a former pumphouse will also be removed/demolished as part of the works and existing overhead electrical lines will be undergrounded. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the pr
Permission for alterations and renovations to existing dwelling house (Protected Structure Ref Lhs012-004a). Works to include repairs, refurbishment, replacement and modification to both internal areas and external facades and all associated site development works
Permission for a new dwelling house, new site entrance and associated site works as previously granted under Planning Ref. No. 211083 and 2360141
Permission of an extension of the existing car park to provide an additional 91 car parking spaces, including new car park lighting and CCTV, comprising a total area of approximately 5,427 square metres *Significant Further Information received on 17/08/2026* *Revised Notices received on 21/08/2026 and 31/08/2026*
Permission for an extension of the existing car park to provide an additional 91 car parking spaces, including new car park lighting and CCTV, comprising a total area of approximately 3,537 square metres
EXTENSION OF DURATION OF 211083 - Permission for a new dwelling house and associated site works