Gurteen, Clareen, Ballymahon
Proposed development
The proposed construction of a pre manufactured timber framed single storey fully detached dwelling in conjunction with the installation of a new septic tank waste water treatment system and all ancillary site works
- Applicant
- Not published
- Authority
- Longford County Council
- Decision due
- 8 Apr 2025
- Residential units
- 1
- Floor area
- 44 m²
Timeline
Application received
12 Feb 2025
Decision due
8 Apr 2025
Decision: refused
26 Mar 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a garden shed to include garden room, games room and storage area and to decommission existing septic tank with percolation area and to install a new treatment system & percolation area with all ancillary site works
of the following: (i) retention of a single storey domestic garage (ii) and retention of a single storey domestic extension to the existing dwelling and minor elevation amendment involving adjustment to a window size and location on the east elevation of the dwelling and all associated site works
to demolish our existing extension and porch at the rear and to construct a new extension at the rear to include a kitchen, dining, living area, study, utility, hall and bedroom 3 and to convert half the shed at the side to a wardrobe and to decommission existing septic tank and to install a new septic tank with percolation area and to retain existing shed with all ancillary site works
the installation of 24 m2 PV solar panels on the non road side of a domestic house