Proposed development
Extension of Duration for Planning Ref. No. 16/418: a ten year permission for development on a site of c. 0.225 ha located within the existing Aughinish Alumina plant consisting of the installation of 2 no. deep thickeners (steel vessels with a diameter of c. 22m and maximum overall height of c.21.9m) and ancillary elements, including stairs, access platforms and walkways linking to adjacent vessels, pumps, cabling and pipework. The development will also consist of the provision of a hardstanding, an internal road (c. 6.1m wide and c. 40.6m long) to the east of the thickeners and all other site development works above and below ground (the application relates to development which comprises or is for the purposes of an activity requiring an Industrial Pollution & Control Licence, now replaced by an Industrial Emissions Licence)
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 24 Jun 2026
Timeline
Application received
30 Apr 2026
Decision due
24 Jun 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Extension of Duration for Planning Ref. No. 16/418: a ten year permission for development on a site of c. 0.225 ha located within the existing Aughinish Alumina plant consisting of the installation of 2 no. deep thickeners (steel vessels with a diameter of c. 22m and maximum overall height of c.21.9m) and ancillary elements, including stairs, access platforms and walkways linking to adjacent vessels, pumps, cabling and pipework. The development will also consist of the provision of a hardstanding, an internal road (c. 6.1m wide and c. 40.6m long) to the east of the thickeners and all other site development works above and below ground (the application relates to development which comprises or is for the purposes of an activity requiring an Industrial Pollution & Control Licence, now replaced by an Industrial Emissions Licence)
an extension of c. 55 sqm to the existing electrical switch room building. Aughinish Alumina Limited carries out an activity on the site requiring an Industrial Emissions Licence(Licence Reg. No. P0035-17)
a ten year permission for development on this site of c. 7 hectares located adjoining the existing Aughinish Alumina Ltd plant for the provision of a Borrow Pit with an extraction area of c. 4.5 hectares to extract c. 374.000 m³ of rock over a 10 year period. The extraction area is sought up to a maximum depth of c. 8.5 m O.D., with extraction to occur between April and September each year. The proposed development includes the demolition of a contractors shed and all ancillary site development, areas of stockpiling, landscaping and boundary treatment works above and below ground, including restoration of the extraction area. Aughinish Alumina Limited carries out an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence – Licence Register No. P0035-06). The development and operation of the proposed Borrow Pit is not a licensable activity. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application.