Unit 2 Blackberry Business Park, Dock Road, Limerick
Proposed development
The construction of a ground and first floor extension to the existing office/workshop building at Unit 2, construction of a first floor office area to the existing building together with all associated incidental and ancillary works, and Retention Permission for the change of use of the previously permitted retail warehousing use of the ground floor of Unit 2 to its current use as office space
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 12 Nov 2026
Timeline
Application received
18 Sept 2026
Last day for public submissions (est.)
Thu 22 Oct 2026
Decision due
12 Nov 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
upgrades to Limerick Wastewater Treatment Plant (WwTP) and Corcanree Pumping Station (PS) which include an increase in the capacity of the existing WwTP, the provision of additional stormwater storage capacity at Corcanree PS and the upgrading of the existing Limerick Sludge Hub to a Regional Bioresource Centre (RBC). The proposed upgrades to the Corcanree PS include a new stormwater storage tank and return pumping station, tank cleaning system, overflow screen, and upgrades to stormwater and foul pumping infrastructure. The proposed upgrades to the Limerick WwTP consist of the construction of a new second parallel biological process stream which includes: new Aerobic Granular Sludge (AGS), influent buffer, sludge buffer and discharge tanks; new inlet works incorporating screens, grit traps, grit classifiers, air blowers, and odour control equipment; chemical dosing tank; transformer; Motor Control Centres (MCC) kiosks; upgrades to the existing final effluent pumps; and associated rising main and gravity outfall pipework connections and diversions. The proposed upgrading of the existing Limerick Sludge Hub to a Regional Bioresource Centre comprises of the following: reuse of existing primary sludge tanks for sludge imports; new sludge reception building and pipe bridge structure; MCC kiosk; new pre-Thermal Hydrolysis Plant (THP) silo; repurposing of the existing sludge building as a THP building to include the installation of THP unit(s) and ancillary equipment; sludge screening platform and skips (covered); repurposing of the existing pre-digester sludge tanks to pre-THP blending tanks; increasing height of the existing post-digester sludge tanks and new tank covers; new thickened sludge storage tank and cover; Combined Heat and Power (CHP) unit and associated plant; new anaerobic digester tank and biogas membrane cover; gas bell storage; new sludge dewatering building with thickeners, polymer dosing and biosolids dewatering installations; silo storage for biosolids cake export; an upgraded wash water system; Liquor Treatment Process (LTP) tank and LTP buffer tank; transformer; and replacement of existing thermal oxidiser with new odour control equipment. The proposed development also includes site lighting (both task and internal access road lighting); landscaping; surface water drainage measures to include Sustainable Drainage Systems (SuDS), internal roads, parking and hardstanding areas and all associated and ancillary site developmen
the change of use of the previously permitted retail warehouse (Planning Permission 02/1288 refers) to current use as a commercial and personal training gym facility, the addition of a glazed porch to the north-eastern elevation, the provision of a first floor, together with all associated incidental and ancillary works
a new metal garage door to existing building
RETENTION of: a) The existing warehouse building and adjacent storage tank which represents a building of reduced scale to that previously permitted by 16/642; b) 3 no. ancillary sheds and tent structure; c) Construction Office, and Office and WC; d) Retention and relocation of 2 no. existing modular office buildings; and e) All ancillary hardstanding, roads and parking areas and permission for construction of an ESB substation and all ancillary landscaping and site development works.
the construction of a ground and first floor extension to the existing office/workshop building at Unit 2, construction of a first floor office area to the existing office building together with all associated incidental and ancillary works
the provision of a new single level indoor padel court facility (c. 1,434sqm), with a maximum height of c. 11m (including 4 no. padel courts, changing rooms, toilets, and staff facilities); provision of new pedestrian and cyclist access points to subject site from link road to the north-east and existing car park to the north-west; amalgamation of 2 no. car parking spaces to provide 1 no. Universally Accessible car parking space; bicycle parking; site lighting; signage zones; SuDS; external plant including below ground proprietary pumping station; piped infrastructure and ducting; changes in levels; hard and soft landscaping; boundary treatment; and all associated site development works above and below ground