Ballyveloge, Patrickswell, Co. Limerick
Proposed development
Alterations to previously approved Planning ref. No. 22/1318. The alterations consist of change of house types for unit numbers 18, 19, 36 and 37 together with all associated site works. Permission is also being sought for the re-positioning of house 35 on the site layout and revisions to the car parking associated with unit numbers 17, 20, 35 and 38 and associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- Not available
- Residential units
- 4
- Floor area
- 572 m²
Timeline
Application received
21 May 2026
Last day for public submissions (est.)
Wed 24 Jun 2026
Council asked for further information
13 Jul 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a 2 storey block consisting of 4 number 1 bedroom apartments with associated external bin and bike storage areas, construction of boundary walls, connection to mains services together with all associated site works
the change of use of an existing retail unit to a funeral undertaker’s office, together with alterations to rear door, internal alterations, new signage, and all associated site works and services
the extension of duration for planning ref. 18/1193, already extended under Planning Ref. 24/7010: a residential development comprising 48 residential units, (46 no. semi-detached houses, 2 no. detached houses), provision of phase 2 part of link road between the Clarina Road and the Lisheen Park (School Road) with site entrances off this new road, and all ancillary site development works. Ancillary site development works include a new connection to the public water main, foul and surface water drainage, access roads, footpaths, vehicle parking, landscaping, boundary treatments and site development works above and below ground
the construction of a single storey extension, for accessible use, containing bedroom, bathroom and utility, to the side of existing house, with adjoining porch to the front of existing dwelling house together with all associated site works
the construction of a detached dormer style dwelling and a single storey detached garage served by a new vehicular entrance, access driveway, mains wastewater connection, connection to adjacent utilities and all associated site works
55no. residential units on serviced sites on the grant of outline permission granted under Planning Application Ref. 25/87 for development at this site: Barnakyle, Patrickswell, Co. Limerick The overall development will consist of: The construction of 55no. residential units on serviced sites (incorporating 43no. 4-bed units and 12no. 2-bed units, across 4no. house types), internal roads and pathways; car parking; hard and soft landscaping and boundary treatments; open spaces; public lighting; substation; new vehicular and pedestrian access onto R526 road, and all associated site development works including drainage and foul sewer infrastructure works and SuDS measures