2660340Grantedpermission

Ballygoughlan, Glin, Co. Limerick.

Not open for objections: The council has already decided this application.

Proposed development

The renovation and extension of an existing farmhouse, to include re-roofing, elevational changes to windows and doors, construction of a side extension for a utility/boot room, the decommissioning of the existing septic tank, and the installation of a replacement packaged wastewater treatment system with percolation area, together with all ancillary site works

Applicant
Not published
Authority
Limerick City and County Council
Decision due
21 May 2026
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    27 Mar 2026

  2. Decision due

    21 May 2026

  3. Decision: conditional

    21 May 2026

  4. Grant issued

    25 Jun 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660943Awaiting decision

a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total area of 245.33 ha, 70.01 ha of which lies within Co. Limerick. The application seeks a 10-year permission with an operational lifetime of 40 years and comprises the following – i. Construction and operation of up to 219,706.1sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. iii. Up to 8 no. electrical inverter / transformer skid units. iv. Construction and operational access to the site by 3 no. site entrances using existing field access points. v. 2 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. vi. Customer substation compound consisting of a single storey substation customer building with welfare facilities (217 sqm), all associated electrical plant and apparatus, underground cabling, lighting columns, parking, storage, fencing, wastewater holding tank and rainwater harvesting tank. vii. 33kV collector cable network, joint bays and associated works. viii. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. The elements of the Proposed Project located in Co. Limerick, as described above in i – ix, are the subject of this planning application. The remaining elements, including the construction of up to 541,306.68 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres, internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units, up to 19 no. electrical / inverter transformer skid units, construction and operational access to the site by 6 no. site entrances, using 4 no. existing field access points and 2 no. new access points, 3 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project, 33kV collector cable network, joint ba

Ballygoghlan, Glin, Co. Limerick Limerick City and County Council Received 14 Aug 2026
25363Granted

the construction of a slatted house, roofed feed passages, slatted tank, holding pens and concrete aprons

Ballyculhane Upper, Glin, Co. Limerick. Limerick City and County Council Received 7 Nov 2025
2442Granted

the (1) Retention Permission for as-constructed equestrian centre comprising 17no. stables, office/canteen, feed store, tack room, toilet facilities and attached hay barn, (change of design from that previously granted under planning ref. 98/189) (2) Retention permission is also sought for a change of site layout from that previously granted under planning ref. 98/189. (3) Planning Permission is also sought for change of use of part of existing stable block to low-capacity pet crematorium, cold store area and processing room and all associated ancillary site works. This development is within the site of a recorded monument, LI017-027, Ringfort-Rath

Ballycullane Upper, Glin, Co. Limerick Limerick City and County Council Received 12 Feb 2024
23604Awaiting decision

the (1) Retention Permission for as-constructed equestrian centre comprising 17no. stables, office/canteen, feed store, tack room, toilet facilities and attached hay barn, (change of design from that previously granted under planning ref. 98/189) (2) Retention permission is also sought for a change of site layout from that previously granted under planning ref. 98/189. (3) Planning Permission is also sought for change of use of part of existing stable block to low-capacity pet crematorium, cold store area and processing room and all associated ancillary site works. This development is within the site of a recorded monument, LI017-027, Ringfort-Rath

Ballycullane Upper, Glin, Co. Limerick Limerick City and County Council Received 15 Dec 2023
211446Refused

the construction of 4no. glamping pods complete with hard and soft landscaping, new site entrance with car parking area, wastewater treatment system followed by polishing filter with all associated site works

Ballygoghlan, Glin, Co. Limerick Limerick City and County Council Received 15 Oct 2021