Lands at Monaleen Road, Castletroy, Limerick
Proposed development
A Large-scale Residential development on these lands at Monaleen Road, Castletroy, Limerick. The development will consist of the provision of a total of 523no. residential units along with the provision of a creche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 214no. 2-3 storey residential dwellings which will consist of 10no. 2 bed units and 204no. 3 bed units. (c) The provision of a total of 309no. apartments units consisting of 159no.1 bed units, 141no.2bed units and 9no. 3bed units to be provided within 10no. apartment buildings. Apartment buildings 1, 2, 3, 4, 5, 8, 9 and 10 are 5 storeys in height and apartment buildings 6 and 7 are part 4 to part 5 storeys in height. (d) Provision of a creche at ground level in apartment building no. 10 and associated outdoor play space along with bin and bicycle storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and apartments. (f) Provision of a basement for apartment blocks 6-9 which incorporates parking, plant area, storage rooms and bicycle storage. (g)Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (h) Provision of associated bicycle storage facilities at surface level throughout the site. (i) Provision of associated open space areas, residential communal open space areas to include formal play areas along with all hard and soft landscape works for private gardens and amenity spaces along with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (j) Provision of an entrance and associated upgrade works from the Monaleen road for vehicles and pedestrians with a separate pedestrian access provided from the Dublin Road. (k) Provision of associated ESB substations. (l) Provision of ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water and ESB networks to include for provision of a wastewater pumping station within the site and provision of a new wastewater connection along Monaleen Road. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the pro
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 28 Apr 2026
- Residential units
- 214
- Floor area
- 214 m²
Timeline
Application received
4 Mar 2026
Decision due
28 Apr 2026
Decision: conditional
28 Apr 2026
Appeal decided: conditional (ACP-324286-26)
1 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the erection of high level building signage to the east elevation and west elevation of Kilmurry Lodge Hotel comprising of individual lettering with an overall sign length of 5.03m and height 0.89m, illuminated by a single continuous LED strip light fitting mounted above the signage, all associated with the hotel development permitted under Planning Ref. 24/61097
the construction of a two storey extension to the rear of the property, conversion of existing attic roof space to first floor bedroom accommodation, the refurbishment and reorganisation of the existing Ground floor layout and all associated site works
the construction of a single storey dwelling, site entrance, connection to existing services, changing position of speed ramp on Monaleen Road and all associated site works, this will involve sub-division of the existing residential site
the construction of a Columbarium wall garden within the boundary of the existing Cemetery. I. Site clearance for garden wall development II. Provision of foundations and installation Columbarium Wall Units III. Provision of paved areas from the existing cemetery footpaths IV. Landscaping, planting and seating V. Any associated drainage works
the demolition of an existing attached garage and boiler house. • The construction of a replacement single-storey extension adjoining the dwelling, providing a bedroom with ensuite and utility room. • Alterations to front porch consisting of repositioning front door from side of porch to front elevation. • The enlargement of existing windows to the front elevation, consisting of enlarging two windows to the living room by dropping the sills to floor level and one arched window in lieu of rectangular window
construction of a dwelling house, garden shed, vehicular access, boundary treatment and landscaping, connections to public services and all associated site development works