Limerick Works, Castlemungret, Limerick
Proposed development
Installation of a solar photovoltaic development with an overall site area of c. 1.80 hectares and a generation capacity of c. 2.47 MWp, on lands at Irish Cement Ltd, Castlemungret, Mungret, Co. Limerick, V94 K194. The development will comprise: ground-mounted photovoltaic panels on supporting frames, 1 no. single-storey transformer cabin, associated cabling and electrical infrastructure, temporary site access, temporary construction compound and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- Not available
Timeline
Application received
3 Feb 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the amendment of Condition No.3 of ABP Ref. No.: PL92.248285 (LCCC Ref. No. 16/345), which states: “3. The total of Solid Recovered Fuel (sourced from Municipal Solid Waste) to be combusted at the cement works shall not exceed 30,000 tonnes per annum. Reason: In order to comply with the policies of the Southern Region Waste Management Plan 2015-2021, which policies are considered to be reasonable.” To read as follows: “3. The total of Solid Recovered Fuel (sourced from Municipal Solid Waste) to be combusted at the cement works shall not exceed 60,000 tonnes per annum, within the existing overall permitted capacity of 90,000 tonnes per annum for all alternative fuels and alternative raw materials. Reason: In order to comply with the policies of the National Waste Management Plan for a Circular Economy 2024-2030”. No works or other interventions involving alterations to the physical aspects of the site are proposed as part of the application. The site operates under Industrial Emissions (IE) Licence No. P0029-06
installation of a solar photovoltaic development with an overall site area of c. 1.80 hectares and a generation capacity of c. 2.47 MWp, on lands at Irish Cement Ltd, Castlemungret, Mungret, Co. Limerick, V94 K194. The proposed development constitutes a relevant solar energy development for the purposes of RED III. The development will comprise: ground-mounted photovoltaic panels on supporting frames, 1 no. single-storey transformer cabin, associated cabling and electrical infrastructure, temporary site access, temporary construction compound and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
(1) demolition of an existing medical centre use building and a medical centre use prefab building, both in rear yard (2) permission to construct a new extension to rear of existing medical centre, (3) alterations to the existing main street building, (4) permission to modify red line plot boundary including revisions to site entrance & site layout relating to planning permission 2460012 to provide alternative medical centre escape route access at rear, including all associated site development works,
single storey extension to rear of existing dwelling house, associated renovation works to include converting the attic into living accommodation and raising the roof creating a storey and a half front elevation and all ancillary site works
the construction of 5 standalone warehouse blocks with 1 block subdivided into 2 warehouses, 3 blocks subdivided into 3 warehouses and 1 standalone warehouse, ESB Substation, new entrance to existing access roadway, internal roadway network and car parking, Foul and Storm water networks, connection to necessary services and all associated and ancillary site works
Extension of Duration for Planning Ref. 24/60017: modifications to the permitted scheme under Reg. Ref. 20/1115. Modifications consist of: replace Blocks 2, 3 and 4 with 19no. 3-bed and 2no. 4-bed houses; reconfiguration of permitted houses (1-20) including change of house types to now include 17no. 3-bed and 3no. 4-bed houses; adjustments to parking and landscaping; all associated development and site works. No changes are proposed to the permitted entrance, Block 1 apartment block, the creche and associated areas. The modification results in a total of 69 units on the wider site as permitted under ref. no. 20/1115