Cois na Féile, Abbeyfeale East, Abbeyfeale Co. Limerick
Proposed development
The demolition of the existing unfinished structures (12 no. dwellings) and the erection and development of 12 no. residential units comprising 10 no. two-storey, 3 bed, semi-detached units and 2 no. single-storey, semi-detached pair 1 no. 2 bed and 1 no. 3 bed. The proposal includes; the completion of the residential access road to service the 12 no. new units, all above and below ground services to link to existing and established services, the integration of the supporting landscaped open space areas and all associated proposed landscape works. In addition, proposed new boundary treatments as incorporate and strengthens existing green infrastructure and enhances biodiversity corridors within and bounding the site. The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU.
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 30 Nov 2025
Timeline
Application received
6 Oct 2025
Last day for public submissions (est.)
Sun 9 Nov 2025
Decision due
30 Nov 2025
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the erection of 10 no. light industrial warehousing units and all ancillary site works including provision of car parking, connection to public services and upgrading the existing access road
(a) demolition of shared chimney stack, (b) alterations to existing windows to front at ground floor level including raising cill and head heights and converting front door ope to window, (c) blocking up window to side (east) at first floor level and forming new window to side (east) at ground floor level, (d) raising eaves, east gable and roof by 600mm, (e) dormer extension to front, (f) construction of single storey extension to rear, (g) reinstatement of vehicular entrance and (h) all associated site works
(a) demolition of single storey porch to front, shared chimney stack and remainder of single storey extension to rear, (b) alterations to existing windows to front and side (west) at ground floor level including raising cill and head heights and converting front door ope to window, (c) blocking up window to side (west) at first floor level, (d) raising eaves, west gable and roof by 600mm, (e) dormer extension to front, (f) construction of single storey extension to rear and (g) all associated site works
change of use of an existing office building to a day service location for people with disabilities with ancillary offices, the installation of new external doors to south and west elevations together with all associated site works
a 3 bay extension onto the existing commercial premises including all ancillary works
(a) Demolition of existing commercial storage building, (b) Construct new two storey dwelling house, (c) Connect to public foul sewer and all public utilities, (d) utilise existing site entrance with all associated site works