Unit 5 Corbally Centre, Corbally road, Limerick.
Proposed development
Change of use from a coffee shop (previously permitted under planning application reference 24/60815) to an Audiologist
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 18 Dec 2025
Timeline
Application received
24 Oct 2025
Decision due
18 Dec 2025
Decision: conditional
12 Dec 2025
Grant issued
22 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the change of use of the existing ground floor from offices to a single residential unit and all ancillary site works
bedroom with en-suite, a kitchen/living room, a detached home office a garden shed, and a boiler house, all for ancillary use of the dwelling. Permission is also sought for construction of a front porch
extensions to front and rear of house at ground floor level and retention of extension to side of house at first floor level
the material change of use of part of the existing premises from office use to a non-residential learning, education and training centre for Rehab Group / National Learning Network, comprising approximately 1,903.03 sqm gross floor area over part of the ground, first and second floor levels, consisting of approximately 37.00 sqm at ground floor level, 1,090.77 sqm at first floor level and 775.26 sqm at second floor level, with new signage to the ground floor entrance and the first floor entrance, including associated internal alterations and all ancillary works
the construction of an additional storey to the existing dwelling at first floor level with changes to the existing ground floor layout and elevations, permission to knock an existing boiler house and all associated siteworks
the demolition of existing single storey extension to the south of the existing house and its replacement with a two storey extension, also to the south/gable end, and all associated site works within the curtilage of a Protected Structure