Roxboro Shopping Centre, Roxborough Road, Roxborough Limerick.
Proposed development
The following works; -a change of use from existing retail Unit 2A to Gym (ground floor and first floor) including internal changes and all ancillary works, -a change of use from existing retail unit 28 to Cafe including internal changes and all ancillary works, -and a change of use from existing retail units 10, 11, 12, 13, 14,15 and 15A, part of café unit 16 and associated internal shopping mall to an amalgamated office space including internal revisions and revisions to associated elevations and all ancillary works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 15 Feb 2026
Timeline
Application received
23 Sept 2025
Council asked for further information
12 Nov 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
19 Jan 2026
Decision due
15 Feb 2026
Decision: conditional
13 Feb 2026
Grant issued
23 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
redevelopment of the existing Roxboro Petrol Filling Station consisting of: demolition of existing forecourt building(shop unit and offices) and storage shed/container; construction of a new replacement petrol filling station forecourt building measuring 254sqm to include shop/deli, staff facilities, offices and storage; provision of replacement brush wash slab and remote dispenser; relocation of waste compactors; bicycle and car parking; retention and enhancement of site boundaries and all associated site development and infrastructure works. Original Planning Ref. No. 20/1206
demolition of existing detached garage and rear extension and construct a single storey extension to the side and rear of existing dwelling and an entrance porch to the front of existing dwelling
construction of an extension consisting of child and adolescent psychotherapy room (therapy room) including toilet/store at the side of the house
demolition of existing rear extension and side garage and the construction of a new extension to the rear and side of the property, the widening of the existing vehicle entrance and all associated site works
partially complete domestic garage to the rear of existing dwelling, and full planning permission is sought for the completion of the partially complete domestic garage and all associated site works
1. Construction of 57 no. residential dwellings on 3 no. main plots, with associated ancillary roads, pedestrian pathways, hard and soft landscaping and site services infrastructure as follows; a. 15 no. 2 storey 3bed terraced houses b. 4 no. 2 storey 4 bed terraced houses c. 1 no. 3 bed duplex apartments d. 18 no. 2 bed duplex apartments e. 1 no. 2 bed apartment and f. 18 no. 1 bed apartments. 2. Development of an access road to the proposed development via an East West Link Road from John Carew Link Road. 3. Provision of public open space areas (to include for play spaces), private open space areas, bicycle parking, footpaths, public lighting, hard and soft landscaping. 4. Provision of car parking to include for 20% EV parking and ducting to the remainder of all the spaces for future electric charging points. 5. Proposed connection to existing mains and water infrastructure. 6. Proposed on-site surface water drainage arrangements and connection to existing storm sewer network. 7. Proposed connection to sewer network, together with all associated site works and services. The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: (a) the proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage 2 Appropriate Assessment is not required. (b) There is no real likelihood of significant effects on the environment arising from the proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning & Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisúin Pleanála for a screening determination as to whether the development would be likely to have significant effect on the environment. Such a submission should be addressed to The Secretary, An Coimisúin Pleanála, 64 Marlborough Street, Dublin 1, D01 V902