Martinstown Stud, Martinstown Kilmallock, Co. Limerick
Proposed development
A ground-mounted solar photovoltaic (PV) energy system and associated site works. The proposed development will comprise a 231.84 kWp solar PV array on approximately 1,125.74 m² of land within the existing agricultural holding. The development will consist of 336 photovoltaic panels, each with a capacity of 690 Wp, mounted on galvanised steel support structures in a fixed, south-facing, portrait layout. The proposal includes all associated underground electrical cabling and connections to the existing residential electricity supply, as well as the use of temporary access routes and a temporary construction compound/set-down area
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 10 Dec 2025
Timeline
Application received
3 Jul 2025
Council asked for further information
26 Aug 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
13 Nov 2025
Decision due
10 Dec 2025
Decision: conditional
9 Dec 2025
Grant issued
20 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
dormer style dwelling to include a vehicular entrance, installation of wastewater treatment, connection to public water supply and associated development works
a hay & machinery storage shed and Retention Permission for an existing agricultural machinery shed
permission to construct an extension consisting of a single classroom with en-suite toilets, accessible wc, extended main entrance; to the side and rear of existing school, decommissioning of existing percolation area, upgrading and relocation of existing wastewater treatment system (permitted previously under planning ref: 11212), new sand polishing filter and all associated site works all within revised site boundaries