Cappamore Community Centre Portnard, Cappamore, Co Limerick
Proposed development
Construction of a boundary wall, footpath, 15 car-parking spaces, and ancillary works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 2 Nov 2025
Timeline
Application received
3 Jun 2025
Council asked for further information
25 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
6 Oct 2025
Decision due
2 Nov 2025
Decision: conditional
29 Oct 2025
Grant issued
2 Dec 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
installation of a standalone Pod structure, 21 square metres, as a sensory room and safe space ancillary to the existing Cappamore Community Hall, together with all associated site works
all works already executed, including: Removal of heating system and some finishes throughout, including fireplace elements, timber floors, skirting boards, dado rails and other works as described in the drawings, Removal of sub-floor timber joists to 3 ground floor rooms, Removal of 3 timber sash windows to ground floor of return to rear, Removal of oil fired central heating system. Permission for development is being sought for other works including: Re-opening of an existing doorway to south and existing window to east, Insertion of new internal doorway to ground floor toilet, Refinishing of slate roof to return to rear, Provision of new timber subfloor to 3 ground floor rooms, General upgrade works to include internal insulation, replacement of PVC windows and external doors with timber goods, insertion of oil fired central heating system with associated goods, insertion of new rainwater drainage routes from outlets to soak-pit, modernisation of the electrical and plumbing system within the dwelling, and all other associated site and general works above and below ground. The works are in the curtilage of a Protected Structure (RPS 1053, NIAH 21806029)
the construction of 2 semi-detached two storey dwelling houses with associated car parking off existing private passageway (which is accessed off Moore St.), connection to main services together with all associated site works
(a) hardcore area to yard; (b) concrete floor area in existing haybarn; (c) external concrete floor with steel columns beside existing haybarn; (d) new walls to existing haybarn; (e) demolition of outbuilding; (f) demolition of site entrance and part of roadside boundary and planning permission is being sought for new roof structure and roof finish over the concrete area with steel columns beside existing haybarn and new site entrance with boundary wall and gate and all ancillary site works
(a) hardcore area to yard; (b) concrete floor area in existing haybarn; (c) external concrete floor with steel columns beside existing haybarn; (d) new walls to existing haybarn; (e) demolition of outbuilding; (f) demolition of site entrance and part of roadside boundary and planning permission is being sought for new roof structure and roof finish over the concrete area with steel columns beside existing haybarn and new site entrance with boundary wall and gate and all ancillary site works
the construction of 2 dwelling houses, each with a vehicular entrance off existing private passageway (which is accessed off Moore St.), connection to main services together with all associated site works