Gotoon, Kilmallock, Limerick
Proposed development
Extension to the side of existing commercial shed, increased roof height, renovation and elevational changes to the existing commercial shed, and all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 14 Apr 2025
Timeline
Application received
18 Feb 2025
Decision due
14 Apr 2025
Decision: conditional
8 Apr 2025
Grant issued
13 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
an existing garage for domestic use
upgrading of the existing grass pitch to artificial full-size all-weather pitch, including floodlights, spectator fencing, ball catch nets and all ancillary site works
(a) the construction of a new concrete terraced area to replace an existing earth embankment to the western side of the main playing pitch and (b) the construction of a new 50m x 30m synthetic training pitch to the eastern side of the main playing pitch (c) the erection of 2.4m high fencing with double gates and a single gate surrounding the synthetic training pitch and (d) the erection of new flood lighting to the synthetic training pitch in the form of 6 No. 12m high lighting poles
the construction of a steel frame & sheeted garage(for domestic use only) to be detached from the existing house which is a protected structure and including ancillary works
the construction and operation of an energy storage system comprising (i) 5 no. containerised energy storage modules placed on concrete plinth foundations; (ii) 5 no. electrical transformer and inverter modules; (iii) heating, ventilation and air conditioning units; (iv) an electrical control building and associated electrical equipment; (v) 320m of site access tracks; (vi) underground electrical and telecommunications cabling; (vii) CCTV security monitoring system; (viii) an up to 2.95m palisade fence around the energy storage system compound; (ix) all ancillary electrical and communications equipment; and (x) all associated site development, drainage and reinstatement works. All
construction of a single storey dwelling, a wastewater treatment system and tertiary filter and upgrade existing entrance with splayed walls and all associated site works