Glenfield, Kilmallock, Co. Limerick.
Proposed development
A new dwelling house, wastewater treatment unit and polishing filter, entrance and all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 13 May 2025
- Residential units
- 1
- Floor area
- 258.2 m²
Timeline
Application received
12 Feb 2025
Council asked for further information
2 Apr 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
16 Apr 2025
Decision due
13 May 2025
Decision: conditional
12 May 2025
Grant issued
13 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
the construction of a single storey dwelling, a new entrance, a sewage treatment system and all associated site works
an Engineering Warehouse which will include a workshop, office, canteen, toilet, store, staff and machine parking, bicycle parking, landscaping, boundary walls and fences, new entrance gate, connection to the existing services and all associated site works
a) construction of a single storey extension to the eastern side of the existing warehouse building to provide additional storage facilities; b) construction of a single storey extension to the northern side of the existing warehouse building to accommodate a product inspection and grading area; c) elevational changes to the southern elevation and to part of the eastern elevation of the existing warehouse building; and d) site works ancillary to the above including installation of a truck loading bay facility and works to footpaths, car park and underground drainage and utility services. The maximum height of the proposed extensions will be approx. 8.25metres above ground level which will match the height of the warehouse section of the existing building
2 constructed domestic garages, a single storey extension to the rear of existing dwelling along with roof windows to front and rear of existing dwelling. All with associated site works
a retail warehouse building, associated car parking, bike shelter, site perimeter fencing, connection to existing foul and storm sewers on public access road and associated site works
the construction of 3 No. Industrial Buildings with ancillary Office and Retail space. The 3 Buildings are located on 3 sites (Site A, B & C) within the proposed development lands. The Building at site A (1,488.4 sqm total) comprises of Tyre storage space and Motor parts storage within the warehouse, reception area with ancillary retail, clean store, roof mounted south-facing solar photovoltaic panels (with associated cabling and ducting), toilet facilities, and workshop with associated loading bays on the ground floor (1,319.2 sqm). The first floor consists of office space, toilet facilities, canteen, and bulk stores for spare parts (169.2 sqm). The buildings on sites B & C will consist of separate Industrial units with ancillary office and reception space (475 sqm on each site). Each of the above sites A, B & C will include provision of staff parking spaces, customer parking spaces, and bicycle parking spaces. The proposal will include all associated site development works, landscaping, fencing, gate access, retaining wall, and installation of electric vehicle parking spaces and associated ducting for electric charging points, associated earthworks, drainage infrastructure and attenuation, security fencing / boundary treatment, bin storage, and all other associated site development works above and below ground level and all other development works as set out in the planning application documentation. All services connections are to previously permitted services on the public estate roads. All of the above is proposed