Railway Bar, Main St., Bruree Co. Limerick.
Proposed development
Extension of the public house to include a function area and outside covered smoking area, toilets storage area and all ancillary works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 6 Oct 2025
Timeline
Application received
2 Jul 2025
Council asked for further information
22 Aug 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
9 Sept 2025
Decision due
6 Oct 2025
Decision: conditional
6 Oct 2025
Grant issued
11 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a) the demolition of an existing 2 storey dwelling and associated garden walls to the south of existing DeValera Museum and Bruree Heritage Centre structure to create accessible public realm with the installation of feature lighting, footpath. (b) a new single storey linear extension to the north of the existing structure (c) a new single storey triangular extension to the east of the existing structure (d) road enhancements along with the provision of 11no. car park spaces and 5 no. bicycle racks to the rear (e) the refurbishment and repurposing of the structure as an interpretation centre with multi-purpose community space including all ancillary site works at the DeValera Museum and Bruree Heritage Centre (Protected Structure RPS no.1036, NIAH Ref no. 21804014)
the construction of a new dwelling house, wastewater treatment unit and polishing filter, vehicular entrance and all associated site works
the demolition of existing substandard dwelling house and replace it with a new single-storey dwelling house of similar size and footprint, to include connecting to the public sewer and ancillary site works
a new roof to 2 no. existing dwellings resulting in an increase in the overall height of the dwellings, provision of a new first floor to both dwellings and box dormers to the rear, elevational changes and all ancillary site works
proposed demolition of existing substandard extension and replacing it with a new extension to the rear of existing dwelling, convert part of existing garage into a home office, associated renovation works, connect to the public sewer and all ancillary site works
a new food production factory. The ground floor will include: a new entrance, reception/office, entrance hall, toilets, staff room, product testing room, production area, fridge room, ingredients and packaging areas, pallet store, transpost office, deliveries, maintenance shed, boiler house, bunded storage tanks, staff and visitor parking and connection to the existing foul and stormwater systems. The first floor will include: sales office, stair shaft, toilet, production area store