Boherboy, Kilcornan, Co. Limerick
Proposed development
Construction of a new dwelling and detached garage, the installation of a waste-water treatment system, a new vehicle entrance and all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 20 Feb 2025
- Residential units
- 1
- Floor area
- 250 m²
Timeline
Application received
18 Dec 2024
Decision due
20 Feb 2025
Decision: conditional
17 Feb 2025
Grant issued
25 Mar 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the change of use of a portion of an existing storage building to a car valeting commercial business, the erection of metal sheeting and signage and all associated site works
a change of house design and relocation of domestic garage to rear of dwelling granted planning under planning ref. no. 24/61275
the construction of a hurling wall, sports pitch lighting, walkway with lighting and all ancillary site works. Original Planning Ref. No. 21/248
the change of use of the formerly vacant service station to a café, the alterations to the front façade of the building, the installation of toilets, benches, seating areas to the front and rear of the property and the erection of signage on site & on the building together with all associated site works
the change of use of the former filling station to a café and for the existing car wash. Planning permission for the construction of new sanitary facilities for the café. Change of use of part of the existing public house/restaurant and function room to provide a gymnasium, a barber shop, and a modified public house/restaurant. Construction of a ground floor extension to provide an access corridor to the rear of the proposed gym; construction of a ground floor extension to provide a new entrance and sanitary facilities for the restaurant and to provide access to the first floor existing residential area. Construction of a first floor extension to the rear to accommodate a fitness studio, changing rooms and ancillary gymnasium areas; a separate first floor extension to staff office facilities; and a new roof connecting with the existing pitched roof structure. Alterations and change of use of the existing go-kart track to an athletics/walking track. Change of use of the existing track viewing area/ changing room structure to sports injury treatment rooms. Alterations to the façade and change of use of the existing storage building to a hydro training area. Construction and installation of 2 no. paddle courts with enclosed glass panel walls. Change of use of the existing barn structure to a car valet and cleaning area. Site development works including: installation of 6 no. sauna and plunge pool pods and a wave pool in a new external recreation area; installation of a new wastewater treatment system; improvements to SUDS drainage infrastructure; alterations to existing vehicle entrances; provision of new parking areas and internal roads; modifications to site walls; installation of new footpaths and pedestrian areas; and all associated site works
amendments to previously approved planning application ref: 21/248. The changes proposed include; walkway lighting changed from 3m to 6m poles, with lighting also on ballstop poles. The walkway design and layout remain as per previous approvals