Bottle Hill, Doon, Co. Limerick
Proposed development
Construction of 28 residential units consisting of 3 no. three bed detached dwellings, 6 no. two bed semi-detached dwellings, 8 no. two bed terraced dwellings, 8 no. three bed terraced dwellings, 1 no. apartment block containing 2 no. two bed apartments, together with entrance, estate road, cycle path, footpaths, car parking and bicycle stands and associated site works including attenuation tanks and surface water outfall. Outline planning permission sought for 10 no. serviced site together with estate road, footpaths and associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 20 Nov 2025
- Residential units
- 27
- Floor area
- 2418.64 m²
Timeline
Application received
29 Nov 2024
Council asked for further information
31 Jan 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
24 Oct 2025
Decision due
20 Nov 2025
Decision: conditional
20 Nov 2025
Appeal decided: conditional (PL-500492-LK-25.)
30 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (housing or apartment development) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
the construction of a detached Gym / Weights building for training purposes adjacent to existing dressing rooms together with all associated site works at the existing sports grounds
the construction of an extension to existing dwelling house including all ancillary site works
the merging of 2 No. dwelling units into a single dwelling unit & all associated site works
the construction of an all-weather playing pitch with an integrated hurling ball-wall and an adjoining pitch for sensory-use, together with perimeter fencing, lighting, and all associated site works at the existing sports grounds
a new single storey school building (100m2), soft play area (50 m2), and all associated site works
material change of use of ground floor section in the North West corner of former St. Joseph's Secondary School to medical centre use, minor internal alterations, reroofing of lean-to roof section on North elevation with new velux type roof lights and all ancillary site works. Former St. Joseph's Secondary School is on the grounds of the Sisters of Mercy Convent Doon and this is on the NIAH(National Inventory of Architectural Heritage) Schedule, Ref No. 21809006. The Convent building complex and curtilage is a candidate Protected Structure. Original Planning Ref. No. 21/349