Tds. of Milltown & Coolyhenan,
Proposed development
Extension of permission for planning ref 12/1002: an electrical transmission substation and associated infrastructure and works, within and adjacent to the site of the existing 220/110kV Killonan substation. The development consists of (1) construction of a 220kV Gas Insulated Switchgear (GIS) substation building, of 1,856m2 gross floor area, with a maximum height of approximately 14 metres above ground level, (2) construction of a 110kV GIS substation building of 1,642m2 gross floor area, with a maximum height of approximately 12.5 metres above ground level, (3) construction of associated and ancillary outdoor electrical equipment and other apparatus; construction of three lightning masts of approximately 18.4 metres in height; internal access road, car parking areas, boundary treatment, associated drainage and site development works, (4) associated transfer of circuits from the existing 220/110kV Air Insulated Switchgear (AIS) substation to the proposed GIS substation, (5) construction of six 110kV end masts to facilitate connection of the existing overhead line transmission circuits to the proposed substation equipment by way of underground cable connections. These end masts will replace six existing end masts which are located within the existing ESB Killonan site. Two of the six end masts will be located adjacent to, but outside the western and southern boundaries of the existing substation complex. One of these two end masts will be located in the townland of Coolyhenan, the other will be in the townland of Milltown. The remaining 4 end masts and all other proposed works are located within the existing ESB Killonan substation in the townland of Milltown. The proposed end masts will measure up to a maximum of 21.5metres in height and will be of a similar form, scale and character to those existing and (6) all associated site development works (this application is for a 10 year permission)
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 5 Jul 2023
Timeline
Application received
11 May 2023
Decision due
5 Jul 2023
Decision: conditional
21 Jun 2023
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
- the construction and operation of a wellness facility incorporating 2no. sauna cabins, 4 no. cold plunge tubs, 2no. changing area, 1no. WC, reception area, maintenance yard and associated ancillary structures - Installation of wastewater treatment facilities and all associated site works - Provision of 14no. car parking, 8no. bicycle parking, signage, landscaping, boundary treatments and connection to existing services - And all ancillary and associated development works above and below ground
extensions previously constructed to the rear of existing dwelling and all associated site works
the development that will consist of: The installation of solar panels on 2 no. steel frames over each roof of 2 no. existing telecommunication cabins (covering an area of approx. 46 sq.m. and approx. 32 sq.m. respectively, each to a maximum height of 4.5 metres above ground level). Works to consist of all ancillary development works including steel uprights
amendments to planning permission 20/983. The development will comprise carrying out part demolition of, and revised alterations and extension to existing dwelling including all associated site development works
the construction of permanent catering unit for the sale of hot food and beverages within the car park of Morrisons Licenced premises
existing steel structure catering unit for the sale of hot beverages