Skehacreggaun, Mungret, Co. Limerick
Proposed development
Modifications to previous planning ref. 20/1114(as modified by reg. ref. 21/1328). Rendered blockwork applied to front facade of house no. 15 in lieu of previously permitted stone
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 22 Mar 2023
Timeline
Application received
26 Jan 2023
Decision due
22 Mar 2023
Decision: conditional
22 Mar 2023
Grant issued
25 Apr 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
alterations to a previously granted planning permission register reference number 24/60578, for development comprising of: 1) The construction of a 2-storey crèche (587 sqm) to accommodate 102no. children and to replace the crèche (320 sqm) permitted under ref: 16/1196, appeal ref: PL91.249186, which was to accommodate 38no. children; 2) The development of associated car parking and all ancillary drainage, landscape, boundary and site development works at Mungret gate, Baunacloka, Mungret, co. Limerick; the alterations to include the following: • Revisions to the number of children to be accommodated in the pre-school / childcare facility to be increased from the as granted 102 to 122 in any session
the change of use from a childcare facility to a single dwelling, minor internal alterations and all associated works. The school is a Protected Structure (RPS Ref. No 1653)
the amendment of Condition No.3 of ABP Ref. No.: PL92.248285 (LCCC Ref. No. 16/345), which states: “3. The total of Solid Recovered Fuel (sourced from Municipal Solid Waste) to be combusted at the cement works shall not exceed 30,000 tonnes per annum. Reason: In order to comply with the policies of the Southern Region Waste Management Plan 2015-2021, which policies are considered to be reasonable.” To read as follows: “3. The total of Solid Recovered Fuel (sourced from Municipal Solid Waste) to be combusted at the cement works shall not exceed 60,000 tonnes per annum, within the existing overall permitted capacity of 90,000 tonnes per annum for all alternative fuels and alternative raw materials. Reason: In order to comply with the policies of the National Waste Management Plan for a Circular Economy 2024-2030”. No works or other interventions involving alterations to the physical aspects of the site are proposed as part of the application. The site operates under Industrial Emissions (IE) Licence No. P0029-06
installation of a solar photovoltaic development with an overall site area of c. 1.80 hectares and a generation capacity of c. 2.47 MWp, on lands at Irish Cement Ltd, Castlemungret, Mungret, Co. Limerick, V94 K194. The proposed development constitutes a relevant solar energy development for the purposes of RED III. The development will comprise: ground-mounted photovoltaic panels on supporting frames, 1 no. single-storey transformer cabin, associated cabling and electrical infrastructure, temporary site access, temporary construction compound and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
the construction of a standalone five storey apartment building comprising 13 no. apartments, together with change of use of the existing crèche to residential use to accommodate 5 no. apartments, along with all associated works. The School is a protected structure (RPS Ref. No. 1653) and is also recorded on the National Inventory of Architectural Heritage (NIAH Ref. No. 21901316)
extending the existing public house into the outdoor seating area between Russell's Select Bar and Unit 1, Racefield Centre, to include new WC in the existing lobby and all ancillary site works