Coolrus, Granagh, Co. Limerick
Proposed development
The construction of building for use for motorcycle sales, repair, storage & maintenance, and new vehicular entrance and all ancillary works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 25 May 2023
Timeline
Application received
29 Aug 2022
Council asked for further information
20 Oct 2022
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
28 Apr 2023
Decision due
25 May 2023
Decision: conditional
25 May 2023
Grant issued
28 Jun 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 5,903 sq.m. The development will consist of the following: • Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a pump house (with a gross floor area (GFA) of c. 279.8 sq.m), and 2 no. post digester tanks (with an overall height of c. 9.1m), located in the northeastern section of the site. • Construction of 2 no. prepits (c. 4.8m in height), a pasteurisation buffer tank (c. 4.8m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located west of the primary digesters, within the northern section of the site. • Construction of a digestate storage tank (c. 11.3 in height) located centrally on site, to the south of the primary and post digester tanks. • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12m and a GFA of c. 2,797.2 sq.m) with odour abatement system (with a height of c. 11m to odour abatement stack), located in the northwestern section of site. • Construction of combined heat and power (CHP) unit (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 38.53 sq.m), a biogas boiler (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 12.74 sq.m), a backup boiler (c. 2.6m in height), a gas treatment system (c. 4.2m in height), a biomethane compression system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the digestate storage tank, in the south-east section of the site. • Construction of a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels), a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 23.5 sq.m and a height of c. 3.4m), located in the south-eastern section of the site. • Construction of roofed silage clamps (with a GFA of c. 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located in the western section of the site. • Construction of a two storey office building (with a GFA of c. 327.4 sq.m and a height of c. 11m) within the western section of the site, adjacent to the site entrance. • Alterations to the adjacent local road including a new site entrance and access arrange
development consisting of construction of building for use for motorcycle sales, repair, storage & maintenance and all ancillary works
construction of a new dormer bungalow dwelling house, detached garage, site entrance, driveway, proprietary wastewater treatment system, percolation area, and all associated site works
construction of a single storey dwelling with attic space, a domestic garage, entrance and a septic tank
construction of a single storey dwelling with attic space, a domestic garage, entrance and a septic tank
the construction of a single storey rear extension to the existing bungalow, conversion of existing attic space to provide two bedrooms and all ancillary site works