Ministerland, Ardagh, Co. Limerick
Proposed development
The construction of a dwelling house, entrance to public road, effluent treatment system with percolation area
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 25 Aug 2022
- Residential units
- 1
- Floor area
- 171 m²
Timeline
Application received
13 May 2022
Council asked for further information
1 Jul 2022
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
29 Jul 2022
Decision due
25 Aug 2022
Decision: conditional
23 Aug 2022
Grant issued
27 Sept 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a) Change of design to clubhouse design as granted under planning reference no. 23/60625, incorporating a lobby entrance (25 sq/m) to the ground floor with revised internal ground floor layout, (b) the construction of a first floor over ground (285 sq/m) consisting of an open plan gymnasium and a multipurpose/meeting room, with revised roof detail, (c) Revised car parking layout to that granted under 23/60625 to accommodate the above proposed revisions, with no further alterations to site entrance or drainage layout
the removal of 1 no. prefabricated building and demolition of single storey shelter. The development will include the construction of a new single storey extension to the front and side of the existing school buildings. It will comprise of 2 no. additional needs classrooms with ancillary spaces and boiler room. Also an accessible parking space and set down arrangement at the main entrance including a new entrance and boundary wall and all associated site works
upgrading and utilising existing vehicular entrance, the decommissioning of existing septic tank system and the installation of a new packaged wastewater unit and percolation area and all associated site works
the construction of a new dwelling house, garage, entrance, drive-way, packaged wastewater treatment system with percolation area and all ancillary site works
a change of use of a portion of the existing light industrial building to 9 no. residential apartment units and associated site works. The development will consist of changes to elevations to accommodate new external windows and doors and internal alterations to construct 3 no. 1 bed apartments at first floor level and 1 no. 2 bed apartment and 5 no. 1 bedroom apartments at ground floor level and all associated site works
the construction of a Two Storey Detached Dwellinghouse, Connection To The Mains Services, Demolition of Existing Derelict House, Including All Ancillary Site Works