Carrowclough, Shanagolden, Co. Limerick
Proposed development
Construction of a two storey dwelling house, waste water treatment system, percolation area, entrance and all ancillary site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 6 Jun 2022
- Residential units
- 1
- Floor area
- 159.1 m²
Timeline
Application received
13 Dec 2021
Council asked for further information
11 Feb 2022
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
10 May 2022
Decision due
6 Jun 2022
Decision: conditional
25 May 2022
Grant issued
28 Jun 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
extension of permission for planning ref. 19/861: filling proposed land with suitable material to the proposed levels and all associated site works
Extension of Duration for Planning Ref. 19/861: filling proposed land with suitable material to the proposed levels and all associated site works
the construction of a 44.7m underground medium voltage(38kV) grid connection cable from the consented Ballinknockane and Ellaha Solar Farm(PA Ref:17/1220) to the section of Solar Farm currently in planning(PA Ref:22/1258) comprising the laying of underground cables and associated infrastructure
filling proposed land with suitable material to the proposed levels and all associated site works
a new 110kV substation to feed into the existing Aughinish - Kilpaddoge 110kV overhead line
the demolition of single storey side extension, the construction of a two storey rear residential extension to replace the existing extension and two new roof dormers to existing cottage, provision of new septic tank and percolation area and ancillary site works at cottage