Inch St. Laurence, Caherconlish, Co. Limerick.
Proposed development
A dwelling house, entrance, front boundary fence, wastewater treatment system and all associated site works as constructed from that previously granted under planning ref. 06/926
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 16 May 2019
- Residential units
- 1
- Floor area
- 244.79 m²
Timeline
Application received
22 Mar 2019
Decision due
16 May 2019
Decision: conditional
14 May 2019
Grant issued
18 Jun 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a new vehicular entrance [in its original permitted location] & alteration to subdividing boundary with neighbouring property to decrease the size area to its original permitted size together with all associated site works. This is a concurrent application with neighbouring property
the as built extension to existing house. Planning permission is also being sought for the following, relocation of existing vehicular entrance, alteration to subdividing boundary with neighbouring property to increase the site area to its original size together with all associated site works. This is a concurrent application with neighbouring property
the development that will consist of the following works: (a) Demolition and removal of existing build on-site. (b) The construction of a new open cycle Turbine Power Generation Station with an output of up to 299 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse building, 1no. HVO fuel storage tank, 1no. dimineralised water storage tank, 1no raw/fire water storage tank, 1no. fire pump house, 2no. demineralised water treatment trailers. (c) The construction of an internal road network providing for access to serve the development. (d) Provision of hard and soft landscaping works, tree planting and boundary treatments including parking, perimeter fencing
as Built Extensions and Entrance including All Ancillary Works
as Built Extensions and Entrance including All Ancillary Works
the demolition and removal of existing build on-site. The construction of a new Gas Fired open cycle Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1 no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse building, 1no. fuel oil storage tank, 1 no. dimineralised water storage tank, 1 no raw/fire water storage tank, 1 no. fire pump house, 2no. demineralised water treatment trailers. The construction of a internal road network providing for access to serve the development. Provision of hard and soft landscaping works, tree planting and boundary treatments including parking, perimeter fencing