Skagh, Croom, Co. Limerick.
Proposed development
The construction of a storage building to store fuel derived from hedge cutting for use in heating the existing dwelling house, to be located within the existing farmyard complex
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 25 Oct 2018
Timeline
Application received
23 Mar 2018
Council asked for further information
16 May 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
30 May 2018
Decision due
25 Oct 2018
Decision: conditional
23 Oct 2018
Grant issued
27 Nov 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the change of use of the vacant own door ‘Former Pharmacy’ unit ( Class 1) to Medical Clinic ( Class 8a)
Extension of Duration for Planning Ref. No. 19/552: 14 no. two bedroom apartments consisting of the following: Block 'A' consisting of 6 no. two bedroom apartments, Block 'B' consisting of 4 no. two bedroom apartments and Block 'C' consisting of 4 no. two bedroom apartments and for landscaping and all associated site works
the development that consists of an extension to the existing facility consisting of additional light industrial manufacturing area, two storey ancillary office space for staff facilities resulting in additional gross floor area of 3050m2. Other works include a proposed new vehicular entrance to the southeast of the site, relocation of exiting football pitch, the construction of a new car park providing an additional 43no. parking spaces including accessible spaces, EV charging stations, and a set-down area. The provision of 1no. loading bay to the northern elevation, secure bicycle parking spaces, plant and photovoltaic units to the roof level, provision of SuDS measures including swale to northwestern end of site with all ancillary landscaping, associated site works and services. The development will also include works to the existing medical facility northern elevation to facilitate integration with the proposed extension
ground floor extension of area 830m2 warehouse, first floor extension to internal mezzanine of area 30m2 office space, alterations to existing facade, external HVAC tanks to the north elevation, 4 no. sheds and alterations to site works including car parking layout
(1) Planning permission for the erection of a new 2 storey detached house. (2) amendments to the existing field entrance gate and adjoining stone wall. (3) And all associated site works on and under land, including a new wastewater treatment system and associated filtration area. Tory Hill House, on adjoining land in the same ownership is a recorded Protected Structure
the erection of a 30 m high lattice telecommunications support structure together with antennas, dishes and associated equipment all enclosed in security fencing and to remove the existing 12m timber pole telecommunications support structure (overall height 14.5m) at the eir Exchange, Tooreen (Td), Croom, Co Limerick. The proposed development is located within the curtilage of the former railway station for Croom, a Protected Structure