5 Oak Drive, Drummagh, Carrick-on-Shannon Co. Leitrim
Proposed development
1. Demolish existing rear extension and sheds, 2. Refurbish existing house to include alterations to elevations, 3. Construct new rear extension to same, 4. Widen existing site entrance and to carry out all associated site development
- Applicant
- Not published
- Authority
- Leitrim County Council
- Decision due
- 15 Jul 2026
- Residential units
- 1
- Floor area
- 71 m²
Timeline
Application received
21 May 2026
Decision due
15 Jul 2026
Decision: conditional
8 Jul 2026
Grant issued
10 Aug 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
2-way lane road linking the current end of the Business Park Road which will sweep around the Fruedenberg Medical site and join into their proposed car park development junction. The development will also include extension of the bicycle and walkway lanes on the inner side of the road that is currently in-situ, ancillary site works, and all works above and below ground to accommodate the above works.
retain the extension to the gable of my dwelling house and all associated works
construct an advanced technology building as follows: industrial unit 1,512sqm with 4 no loading bays to rear, 512sqm 2-storey office and reception area to front comprising 269.5sqm at ground level and 242.5 sqm at first floor level (overall floor area 2,027sqm); 56 no. parking spaces and 5 no disabled parking spaces, entrance from existing access point to access road (constructed under previously approved reg ref: 15/110), bicycle stand and electric vehicle charging station, solar panels to roof, provision of grey water system and associated underground water storage tanks, connection of all site services and all ancillary works
The development consists of the retention of 1) installation of 2 no. new steel shipping containers to serve as temporary changing rooms, new portacabin to facilitate refreshments area, complete with concrete apron between; 2) relocation of existing toilet block portacabin and former changing room to facilitate equipment storage; 3) installation of portaloo and 4) construction of stoned carparking area.
Development of phase 1 of new club facilities to include 3 No. playing pitches, parking area, temporary dressing rooms, new access onto the public road with realignment of the Cornamucklagh road/Summerhill road junction, connection to services and all associated site development works
(a) the removal of an existing attached bedroom to the side of an existing two storey dwelling and the construction of a single-storey extension to the same side of the dwelling., (b) Retention of elevational changes to 2 no. chimneys, the roofs, the walls and the windows of the existing two storey dwelling together with all associated site works.