Carrickacroghery, Dromahair, Co Leitrim
Proposed development
Extension of duration for 3 years
- Applicant
- Not published
- Authority
- Leitrim County Council
- Decision due
- 17 Mar 2026
Timeline
Application received
21 Jan 2026
Decision due
17 Mar 2026
Decision: unconditional
9 Mar 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
- EXTENSION TO EXISTING DWELLING AS CONSTRUCTED, - EXISTING DETACHED DOMESTIC GARAGE AS CONSTRUCTED.
I, Joe Mc Goldrick, wish to apply for full retention permission for the following works, parent planning file: P.07/1140 refers: 1. To retain changes to existing Western front facade and all ancillary works. 2. To retain the extension of the floor space of the shop by way of change of use from an adjacent residential/commercial property and amalgamation of this area into shop use and all ancillary works. 3. To retain an extension to the rear of the existing shop and all ancillary works. 4. The retention of a caged gas storage unit.
The development will consist of: The construction of 2 no. outdoor padel courts (each measuring 20m x 10m) with associated perimeter enclosures comprising tempered glass panels and powder-coated steel mesh fencing to a maximum height of approximately 4 metres. The development will also include: • Artificial turf playing surface with sand infill and shockpad, including drainage and reinforced concrete base; • Installation of LED sports lighting on columns approximately 6–8 metres in height; • Provision of access pathways and minor ground works; • Installation of net systems and all associated court equipment; • All associated site development and ancillary works. The proposed development is to be located within the existing Dromahair Community Park and will utilise existing access and parking facilities. A Natura Impact Statement has been prepared in respect of the proposed development.
the converted residential 2-bedroom house in the building, previously operated as a creche facility. Planning permission was granted for the creche facility in February 2008. No structural changes were made to the building upon conversion into a residential house.
rear extension and renovation to existing dwelling including alterations to existing front porch and change to existing windows at no. 7 Abbeyvale, Dromahair, Co. Leitrim.
Planning permission to retain the as constructed layout and changes to planning permission PL22/138. Including the following changes: (1) First Floor changes: 2-bedroom suite to 2no. 1 bedrooms and associated changes to access and internal layout, a bedroom to a kitchen, (2) Ground Floor changes: new corridor through 2-bedroom suite and change to access to suite, kitchen and bedroom in managers suite swapped, laundry room changed to computer room and new ESB Room, all associated changes. (3) Upper Basement Changes: new corridor through 3-bedroom suite and internal changes, staff toilet and store amalgamated into a laundry room, location of internal stairs, all associated changes. (4) Lower Basement Changes: open plan kitchen and dining area with toilets and upper sitting area and ESB room in lieu of 2no. 3-bedroom suites and laundry room and all associated changes. (5) All other minor internal changes, (6) Fenestration changes at basement levels to side and rear elevations. (7) Changes to retaining wall and ground level to side with ramps from car park (8) all ancillary site works at the Abbey Manor Hotel, Main Street, Dromahair, Co. Leitrim, F91 AT22. This is a protected structure