RATHLEAGUE, PORTLAOISE, CO. LAOIS
Proposed development
Retain shed and external storage area with metal cladding to roof and all associated site works
- Applicant
- Not published
- Authority
- Laois County Council
- Decision due
- 31 Mar 2026
Timeline
Application received
4 Feb 2026
Decision due
31 Mar 2026
Decision: conditional
27 Mar 2026
Grant issued
28 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
develop at Portlaoise GAA, Rathleague, Portlaoise, Co. Laois, R32 Y160. The development will consist of the relocation of existing Pitch 1 northwards/north-eastwards and the associated relocation and provision of goalposts, dugouts, scoreboard, ball-stop netting of up to 15m in height, sideline protection netting of up to 6m in height and perimeter spectator fencing; the extension of the existing amenity/maintenance route around the relocated pitch; the removal of sections of existing fencing and approximately 128m of existing hawthorn hedgerow and the provision of replacement boundary fencing at 1.8m in height, approximately 110m of new hawthorn hedgerow and associated tree planting; the provision of landscaped earth mounding, including mounding of up to approximately 2.5m in height along the northern part of the site; the provision of a landscaped natural-timber playground incorporating play equipment not exceeding 4m in height, play mounds of up to approximately 3.5m in height, safety surfacing, a 1.2m high timber boundary fence, seating, bins and drinking-water provision; the provision of a reinforcedgrass overflow parking area with associated landscaping; surface-water drainage and Sustainable Urban Drainage Systems infrastructure; and all associated earthworks, landscaping, services, boundary treatments and site-development works at Portlaoise GAA Club, Rathleague, Portlaoise, Co. Laois
carry out development which will consist of the relocation of existing Pitch 1 northwards/north-eastwards and the associated relocation and provision of goalposts, dugouts, scoreboard, ball-stop netting of up to 15m in height, sideline protection netting of up to 6m in height and perimeter spectator fencing; the extension of the existing amenity/maintenance route around the relocated pitch; the removal of sections of existing fencing and approximately 128m of existing hawthorn hedgerow and the provision of replacement boundary fencing at 1.8m in height, approximately 110m of new hawthorn hedgerow and associated tree planting; the provision of landscaped earth mounding, including mounding of up to approximately 2.5m in height along the northern part of the site; the provision of a landscaped natural-timber playground incorporating play equipment not exceeding 4m in height, play mounds of up to approximately 3.5m in height, safety surfacing, a 1.2m high timber boundary fence, seating, bins and drinking-water provision; the provision of a reinforcedgrass overflow parking area with associated landscaping; surface-water drainage and Sustainable Urban Drainage Systems infrastructure; and all associated earthworks, landscaping, services, boundary treatments and site-development works
retain Extensions to Front and Side of Dwellinghouse and all associated site works
develop at Portlaoise GAA, Rathleague, Portlaoise, Co. Laois, R32 Y160. The proposed development will consist of amendments to the permission granted by Laois County Council under LCC Reg. Ref. 25/60304 as follows: (1) The replacement of 4 no. permitted handball alleys with 2 no. equipment storage rooms; (2) The addition of 2 no. ball alleys/striking alleys, measuring c.366.3 sqm, to the southern façade; (3) An external ball wall 30m in width is proposed to the permitted south-eastern façade; (4) The relocation of the permitted pumping station on the southern façade; (5) The extension of the permitted precast south-eastern façade wall to conceal the proposed ball alleys and the relocated pumping station; (6) c.60 sqm of additional floor space at loft level above first floor level for the accommodation of plant/mechanical equipment; (7) Black ventilation louvres above external doors of the indoor training pitch and additional roof vent popups; (8) Modification of the roof overhang structure to incorporate rainwater downpipes in lieu of rain chains; (9) Omission of 1 no. external door to plant room; (10) External roller shutter door to the southeastern elevation; (11) A reduction of 2 no. car parking spaces from the permitted 227 no. spaces to 225 no. proposed spaces (incl. 11 no. accessible spaces, 21 no. EV spaces, 1 no. EV accessible space), 3 no. motorcycle spaces, 4 no. bus spaces, 1 no. dedicated accessible set down space and standard set down spaces; (12) A reduction of 2 no. bicycle parking spaces from the permitted of 227 no. spaces to 225 no. proposed spaces; (13) Signage to the northwestern façade consisting of Portlaoise lettering and club logo; (14) Updated layout of Pitches 2 and 3 including associated landscape and additional scoreboard; (15) All associated site development, civil and landscaping works to include the provision of grasscrete overrun surfacing at the main entrance.
provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.
develop Phase 4 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 3 are submitted alongside this Phase 4 application. The Phase 4 site is generally bound by: the Holy Family Schools to the north; Ashewood Walk residential estate and agricultural lands to the east; and agricultural lands to the west (proposed Phase 3) and south. The development will principally consist of the provision of 36 No. 4-bed, 2 No. storey houses. The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground