ObjectRight
Back to search
2640Awaiting decisionpermission

Timahoe Rd, Portlaoise, Co. Laois

Not open for objections: The council has marked this application invalid or closed.

Proposed development

Social Sauna & Wellness Courtyard Complex, consisting of office administration block, saunas, plunge pool, cold baths, changing rooms, garden room, toilets, store room, carparking & ancillary site works including signage.

Applicant
Not published
Authority
Laois County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    10 Jun 2026

  2. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The council has marked this application invalid or closed.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660780Open · 20 days left

retain a two-storey extension to the rear and side of the existing dwelling house, amendments to elevations, a domestic shed and all associated site works

54 Kylebrook, Abbeyleix Road, Portlaoise Co. Laois Laois County Council Received 30 Oct 2026
2660642Awaiting decision

retain amendments to 7 No. houses permitted as part of the residential development granted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. Retention permission is sought for the re-orientation of 6 No. 4-bed houses (‘D’ house type) located along the northern boundary of the site, resulting in the front of the house now facing the internal street to the north; the relocation of the adjacent 4-bed house (‘B1’ house type) further west by approximately 2-metres; and minor amendments to hard and soft landscaping, boundary treatments, car parking and all other associated works above and below ground located adjacent to and within the curtilage of the 7 No. houses. No amendments have been made to the remaining 85 No. permitted residential units.

A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. Laois County Council Received 14 Sept 2026
2660636Awaiting decision

make amendments to the residential development permitted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. The proposed amendments principally comprise: the replacement of 18 No. permitted two-storey 4-bed houses within the south-eastern extent of the site with 24 No. houses (19 No. three-storey 3-bed houses and 5 No. two-storey 4-bed houses), resulting in an increase of 6 No. houses; and the repositioning of 4 No. permitted two-storey 4-bed houses further north by approximately 1-metre to align with the front building line of the other permitted houses along the same street. The proposed amendments also comprise: new bicycle stores; amendments to the location and number of car parking (additional 12 No. spaces proposed); private amenity space; hard and soft landscaping; boundary treatments; and all associated works above and below ground.

A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. Laois County Council Received 11 Sept 2026
2660624Awaiting decision

retain amendments to 7 No. houses permitted as part of the residential development granted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. Retention permission is sought for the re-orientation of 6 No. 4-bed houses (‘D’ house type) located along the northern boundary of the site, resulting in the front of the house now facing the internal street to the north; the relocation of the adjacent 4-bed house (‘B1’ house type) further west by approximately 2-metres; and minor amendments to hard and soft landscaping, boundary treatments, car parking and all other associated works above and below ground located adjacent to and within the curtilage of the 7 No. houses. No amendments have been made to the remaining 85 No. permitted residential units.

A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. Laois County Council Received 8 Sept 2026
2660627Awaiting decision

amend the residential development permitted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. The proposed amendments principally comprise: the replacement of 18 No. permitted two-storey 4-bed houses within the south-eastern extent of the site with 24 No. houses (19 No. three-storey 3-bed houses and 5 No. two-storey 4-bed houses), resulting in an increase of 6 No. houses; and the repositioning of 4 No. permitted two-storey 4-bed houses further north by approximately 1-metre to align with the front building line of the other permitted houses along the same street. The proposed amendments also comprise: new bicycle stores; amendments to the location and number of car parking (additional 12 No. spaces proposed); private amenity space; hard and soft landscaping; boundary treatments; and all associated works above and below ground.

A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. Laois County Council Received 8 Sept 2026
2660408Granted

construct a Car Wash Automated Unit, a plant room with a water recycling system and all associated site works.

Lismard Business park, Portlaoise, Co. Laois Laois County Council Received 26 Jun 2026