Watercastle Cross, Durrow Road, Abbeyleix
Proposed development
Demolish old workshop and construct new workshop toilet and entrance
- Applicant
- Not published
- Authority
- Laois County Council
- Decision due
- 3 Aug 2026
Timeline
Application received
9 Jun 2026
Decision due
3 Aug 2026
Decision: unconditional
21 Jul 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
retain an office and staff facilities, and the permission for the installation of a new wastewater treatment system with a packaged tertiary treatment system and attenuation layer and the decommissioning of existing septic tank. The area to be retained is circa 0.42 hectares and includes all ancillary site works and services.
retain structures at Granafallow, Abbeyleix, Co. Laois. The development consists of the retention of an office and staff facilities, the installation of a new wastewater treatment system with a packaged tertiary treatment system and attenuation layer and the decommissioning of existing septic tank. The area to be retained is circa 0.42 hectares and includes all ancillary site works and services.
erect a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with associated antennas and dishes and to remove the existing 15 metre lattice telecommunications structure. The proposed development is all enclosed within an existing compound
alter roof design from that granted planning ref no. 21/914 and all associated and necessary site works
erect a new dwelling house, septic tank treatment system, new site entrance and all associated site works.
retain concrete floor slab and apron to proposed extension to existing joinery shed and full planning permission to renovate and extend same joinery shed to include altering portion of roof and installing office, canteen and toilet, to include an extension to side, installing air filtration system, connecting to existing services, car parking and all associated and necessary site works using existing entrance