Rossmore, Killeshin, Co Laois
Proposed development
Extend duration of PL 20/478 in regards the construct a storey and a half type dwelling, domestic garage
- Applicant
- Not published
- Authority
- Laois County Council
- Decision due
- 1 Jul 2026
Timeline
Application received
7 May 2026
Decision due
1 Jul 2026
Decision: refused
22 Jun 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
• Install approximately 1.7km of underground electrical cabling (33kV), together with all associated infrastructure and ancillary works. • 38kV Substation and associated compound including a single storey control building (5.2m height and 195sqm) and all associated electrical infrastructure and apparatus, including new and upgraded site entrance and access road and associated ancillary site development works. • Installation of approximately 390m of underground electrical cabling (38kV) from the proposed substation, creating a loop-in connection to the existing 38kV underground electricity network, together with all associated infrastructure and ancillary works. • Junction accommodation works along the turbine delivery route, including temporary overrun areas, and associated works. A concurrent planning application is being made to Carlow County Council for the following elements within the administrative boundary of Carlow County Council: • Installation of approximately 5.7km of underground electrical cabling (33kV) together with all associated infrastructure and ancillary works. • Upgrading of approximately 3.1km of an existing forestry track. • New and revised onsite access track between T1 and T3. • Minor reorientation of the approved turbine hardstands to improve site functionality and layout. • Omission of the on-site substation. • Site drainage and tree felling. • All associated ancillary works. The proposed development forms part of works to facilitate the permitted Bilboa Wind Farm (Planning Ref: CCC Ref: 22/340 / ABP PL01.318295). Permission was previously granted by Laois County Council (Planning Ref: 20/281) and subsequently expired. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance and alterations to boundary location granted under Planning Reference 24/60464 and all associated site works.
construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance (granted under Planning Reference 24/60464) and all associated site works
construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance (granted under Planning Reference 24/60464) and all associated site works
construct a single storey dwelling, a domestic garage, bored well, secondary treatment system & soil polishing filter, new entrance and all associated site works
construct a single storey dwelling, a domestic garage, bored well, secondary treatment system & soil polishing filter, new entrance and all associated site works