40 Rossdaragh Hill, Portlaoise, Co. Laois
Proposed development
Construct Ground floor extension to rear and first floor extension to side of existing dwelling house, internal alterations and changes to external elevations, ancillary site services and all associated site works
- Applicant
- Not published
- Authority
- Laois County Council
- Decision due
- 8 Dec 2025
- Residential units
- 1
- Floor area
- 68 m²
Timeline
Application received
14 Oct 2025
Decision due
8 Dec 2025
Decision: conditional
5 Dec 2025
Grant issued
20 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Construct domestic garage remove front window in bedroom and fit new window in gable end wall, also fit velux window over bedroom
Construct domestic garage, remove front window in bedroom and fit new window in gable end wall, also fit velux window over bedroom.
CONSTRUCT PROPOSED GROUND FLOOR EXTENSION- 4.5msq TO THE REAR, WEST FACING ELEVATION, PROPOSED FIRST FLOOR LAYOUT OVER THE EXISTING GROUND FLOOR AND PROPOSED GROUND FLOOR LAYOUT - 21.2msq AND ALL ASSOCAITED SITE WORKS
construct PROPOSED GROUND FLOOR EXTENSION- 4.5msq TO THE REAR, WEST FACING ELEVATION, PROPOSED FIRST FLOOR LAYOUT OVER THE EXISTING GROUND FLOOR AND PROPOSED GROUND FLOOR LAYOUT - 21.2msq AND ALL ASSOCAITED SITE WORKS
upgrade and extension of the existing Borris Road Wastewater Pumping Station and to upgrade sections of the incoming gravity sewer network: 1. Alterations to the existing Wastewater Pumping Station (WwPS) site at Borris Road comprising: a. Construction of a new emergency storage tank and associated equipment including vent stack, facilities, vehicle and maintenance access, overflow and return pipework with the existing wet well, ducting to existing control room and soft landscaping. b. Surface water diversion to facilitate emergency storage tank installation. c. Ducting & vacuum pump pit for emergency storage tank cleaning system. d. Below ground construction of an upsized gravity sewer from and new sewer connection point at the roundabout to the north of Colliers Lane e. All associated ancillary works including?site works?and temporary working areas.? 2. Upgrades to an existing sewer pipe and connection between Colliers Way and Colliers Lane comprising: a. Below ground construction of a new sewer pipe between Colliers Way and Colliers Lane including new sewer connection and manholes. b. All associated ancillary works including?site works?and temporary working areas.?
extend to rear of existing dwelling house and all associated site works.