Clonkeen, Portlaoise, Co Laois
Proposed development
Construct two storey detached domestic dwelling house, detached domestic garage, sewer treatment system with a raised soil polishing filter percolation area, together with a new site entrance and access driveway and all associated site works.
- Applicant
- Not published
- Authority
- Laois County Council
- Decision due
- Not available
Timeline
Application received
2 May 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of: -Retention of existing mobile homes on site. -planning permission for the demolition of existing shed and subsequent relocation to a new location within the site. -planning permission of a new two storey dwelling house with a carport / garage, a septic tank and percolation area together with all associated site works.
construct Two storey detached domestic dwelling house, detached domestic garage, sewer treatment system with a raised soil polishing filter percolation area, together with a new site entrance and access driveway and all associated site works.
develop a Renewable Gas Facility, associated peat deposition area and external and internal road upgrades at Cúil Na Móna Bog within the townland of Clonboyne and Clonkeen, Portlaoise, Co. Laois. The total area of the proposed development is 17.34 Ha and consists of the following elements: 1. Renewable Gas Facility (6.85 Ha) including the following: Weighbridge and Weighbridge Office - 21m2 in area 4.45m high, Administration Building 228m2 in area 5.1m high, Reception Building 2,700m2 in area 11.75m high, Odour Abatement unit 400m2 in area stack height 18m, Tank Farm - 2 no. primary digestion tanks (6,500m3) 22m high; 2 no. secondary digestion tanks (5,650m3) 17.2m high; 2 no. buffer storage (450m3) 6m high; 4 no. liquid feed intake tanks (100m3) 12m high; 2 no. process water tanks (30m3) 7.5m high; 4 no. pasteurisation tanks (30m3) 7.5m high, Gas Upgrade and Injection Plant 1,278m2, Covered Digestate lagoon 55,100m3 capacity, Surface Water Attenuation pond 20m x 30m, Wastewater below ground holding tank 10m3 capacity, Palisade site fencing 2.4m high, 1,420m in length, On-site electrical sub-station up to 22m2, Circulation yard area 3,500m2 incl. 28 no. car parking spaces. 2. Peat deposition and surrounding area (9.13Ha) 3. External road upgrades including proposed new roundabout, upgrade of R445 and local access road to existing site entrance - 660m in length (0.91Ha) 4. Internal upgrade of site access road - 443m in length (0.45Ha). Permission is sought for a period of 10 years and is a development that is for the purpose of an activity requiring an Industrial Emission Licence from the EPA. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared and accompanies this planning application.
develop a Renewable Gas Facility, associated peat deposition area and external and internal road upgrades at Cúil Na Móna Bog within the townland of Clonboyne and Clonkeen, Portlaoise, Co. Laois. The total area of the proposed development is 17.34 Ha and consists of the following elements: 1. Renewable Gas Facility (6.85 Ha) including the following: Weighbridge and Weighbridge Office - 21m2 in area 4.45m high, Administration Building 228m2 in area 5.1m high, Reception Building 2,700m2 in area 11.75m high, Odour Abatement 400m2 in area stack height 18m, Tank Farm - 2 no. primary digestion tanks (6,500m3) 22m high; 2 no. secondary digestion tanks (5,650m3) 17.2m high; 2 no. buffer storage (450m3) 6m high; 4 no. liquid feed intake tanks (100m3) 12m high; 2 no. process water tanks (30m3) 7.5m high; 4 no. pasteurisation tanks (30m3) 7.5m high, Gas Upgrade and Injection Plant 1,278m2, Covered Digestate lagoon 55,100m3 capacity, Surface Water Attenuation pond 20m x 30m, Wastewater below ground holding tank 10m3 capacity, Palisade site fencing 2.4m high, 1,420m L, On-site electrical sub-station up to 22m2, Circulation yard area 3,500m2 incl. 28 no. car parking spaces. 2. Peat deposition and surrounding area (9.15Ha) 3. External road upgrades including proposed new roundabout, upgrade of R445 and local access road to existing site entrance - 660m in length (0.91Ha) 4. Internal upgrade of site access road - 443m in length (0.45Ha). Permission is sought for a period of 10 years and is a development that is for the purpose of an activity requiring an Industrial Emission Licence from the EPA. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared and accompanies this planning application.
construct a single storey dwelling, installation of a new waste water treatment system, new singular vehicular entrance and all ancillary works
construct a new storey and half style dwelling house, garage, septic tank and all associated site works