Oldglass, Ballacolla, Co. Laois
Proposed development
(1) Retention permission for Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retention permission for the on-going temporary storage on the quarry of clean stone from other quarries, for use as building stone with a maximum storage at any one time not exceeding of 500 tonnes. (3) Planning permission is sought for the restoration of the quarry, comprising the reuse and grading back of the existing stockpile of over burden currently stored on the site. (4) all ancillary site development works.
- Applicant
- Not published
- Authority
- Laois County Council
- Decision due
- Not available
Timeline
Application received
29 Nov 2024
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construct a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle charging bays and 4no. charging points which will replace 14no. existing spaces, (ii) Installation of new EV canopy with associated illuminated signage, (iii) new modular ESB Substation, (iv) new EV banner and other signage, (v) signature wall, (vi) relocation of existing lighting columns, new road markings and, (vii) all other associated drainage and site development works.
construct: a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle charging bays and 4no. charging points which will replace 14no. existing spaces, (ii) Installation of new EV canopy with associated illuminated signage, (iii) new modular ESB Substation, (iv) new EV banner and other signage, (v) signature wall, (vi) relocation of existing lighting columns, new road markings.
I. Install new 5,000lt Aboveground Self Bunded Fuel Storage Tank with Integrated Dispenser, II. Associated signage, III. All associated site development works.
install a new 5,000lt Aboveground Self Bunded Fuel Storage Tank with Integrated Dispenser II. Associated signage, and III. all associated site development works.
(1) Retention permission for Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retention permission for the on-going temporary storage on the quarry of clean stone from other quarries, for use as building stone with a maximum storage at any one time not exceeding of 500 tonnes. (3) Planning permission is sought for the restoration of the quarry, comprising the reuse and grading back of the existing stockpile of over burden currently stored on the site. (4) all ancillary site development works.
(1) retain permission for quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators; (2) retention permission for the on-going temporary storage on the quarry of clean stone from other quarries, for use as building stone with a maximum storage at any one time not exceeding 500 tonnes; (3) planning permission is sought for the restoration of the quarry, comprising the reuse and grading back of the existing stockpile of over burden currently stored on the site; (4) all ancillary site development works