Skeard, Kilmacow, Co Kilkenny
Proposed development
For change in design to single storey dwelling house to previously granted planning permission Ref No 23/266 to reverse house floor plan with alterations to windows, minor internal alterations and revised new front porch design with new site entrance and driveway, connect foul drainage to wastewater treatment system and percolation bed as previously granted planning permission with all associated site works to site
- Applicant
- Not published
- Authority
- Kilkenny County Council
- Decision due
- 13 Dec 2026
- Residential units
- 1
- Floor area
- 220 m²
Timeline
Application received
19 Oct 2026
Last day for public submissions (est.)
Sun 22 Nov 2026
Decision due
13 Dec 2026
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a new shed for the purposes of truck dismantling and all associated site works
permission to retain existing wastewater treatment system and all associated site works
Permission for removal of an old septic tank due to it not functioning as required for household use and contamination of soil due to damage. Installation of a Sequencing Batch Reactor mechanical aeration system designed to cater for 6/8 population equivalent and consists of: A dual chambered precast concrete tank for primary and secondary treatment, a treatment unit consisting of Aerator, a Discharge pump and level switch and a dedicated Programmable Logic Control Panel with integral alarm. This Tertiary Batchpur Wastewater Treatment System and 300 mm stone layer soak pit was installed by Corcoran Precast Tanks on our 1.2 acre site, X91ET04. Date installed August 2022. This system was recommended based on the results of a percolation test to ensure our waste water was managed effectively
to form a new vehicular site entrance and construct single storey dwelling house with wastewater treatment system and percolation bed, connect to public water mains in the road with all associated site works to site
to construct 1) workshop extension beside the existing workshop 2) modification to existing workshop on mezzanine level 3) demolishing existing two bay workshop to front of site 4) construct new building for offices and parts store where workshop was demolished 5) new designated parking area 6) installation of new bunded tanks 7)permission for retention of the installation of a treatment plant and percolation area and all associated site works
for the construction of an animal house with under ground slurry storage tank with concrete apron and all associated site works