One story single dwelling, 3 bedrooms, on family land. Parents downsizing and want appropriate living space for their retirement. Front stone porch, side private existing entrance.
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
7 Oct 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a single storey dwelling with a floor area of 162 square metres, with an existing agricultural entrance, the provision of a new wastewater treatment system and associated percolation area, and all associated site development works
A single-storey swimming pool block to the side & rear of the existing house. The block will be connected to the back of the house via a glazed link corridor to a proposed winter garden, and will contain the swimming pool area, changing rooms, a gym, a sauna and a plant room to the rear, and a proposed three car garage & shed to the front. Permission is also sought for all ancillary site works to include connection to the existing wastewater treatment system on site, and roof rainwater to a proposed soakaway.
a single storey detached car port with storage area abutting existing garden wall located to the rear of existing dwelling and all associated services and site works
The development will consist of a single storey detached car port with storage area abutting existing garden wall located to the rear of existing dwelling and all associated services and site works.
for a 10-year permission for the expansion of the brewery facility (permitted under Reg. Ref: 22/1291 and ABP Ref.: 316491 (referred to below as Brewery 1) and described as follows: Brewery 2 Building: (c.9,333m2) Single and two-storey building including brewhouse, storage and handling areas, lab, control room, workshop, plant rooms/areas (internal and external roof-mounted), storage rooms/areas, process areas, utilities and services areas, circulation, office and welfare facilities, and all associated ancillary areas. Building height to a maximum of c.18.4m comprised of ground floor area (c.8,483m2), 1st floor (c.850m2). External Yard adjacent to the Brewery 2 Building: 36 No. new storage vessels/silos/tanks, with associated access platforms, to a maximum height of c.23.3m. Provision of external pipe bridges to a maximum height of c.7.7m. Extension to Brewery 1 - Raw Materials Handling (RMH) Facility to serve Brewery 2: Comprising a 4-storey c.22.3m high extension to Brewery 1. The extension is c. 1,242m2 and includes a raw materials deliveries area (open area with canopy - c.248m2 in extent), 12 no storage vessels plus 3 no. grain silos with truck set down area, pipe bridge connection between the RMH and Brewery 2 (brewhouse) partially covered for pedestrian movement between Brewery 1 and 2. Relocation of approved backlit “Diageo” lettering sign (size 0.9m high 4.275m wide) on existing northern façade to proposed RMH Extension. Tanker filling station expansion (open areas under canopies): 2 no. additional covered tanker bays to be added to permitted Tanker Filling Station (under 22/1291) (c.270m2) with a further 2 no. covered tanker bays to be located adjacently (c.270m2). Roaster Building: 4-storey building (c.3,010m2), to a height of c.19.4m, above part-basement to accommodate plant and equipment associated with the roasting process and including ancillary facilities such as roast handling, barley intake, control room, workshop and associated staff rooms, internal and external plant and 12 No external silos with associated access stairs and platforms. Biogas Filling Station and ancillary external plant compound: c. 1,265m2 of yard area including containerised control room (11m2) to a height of c.3m. Fire Fighting Systems (external compound): comprising back-up generator, fire water tanks, pump equipment. Extension to Permitted Water Utilities Plant: including single storey building containing water treatment and recovery plant (c.359m2) to a height of
for a 44.5 m extension of the established spur road from the Newbridge Southern Outer Orbital Road (NSOOR) along the eastern boundary of the Murphy International Limited Headquarters site at Great Connell, Newbridge, and the widening and modification of the existing pedestrian zebra crossing on the spur road to the Headquarters site. The proposed spur road extension comprises a single carriageway road of 7.5m in width with 2 no. 2 m wide cycleways and 2 no. 2 m pedestrian pathways, a 1.5 m grass verge on each side, and a 1.5m landscape buffer zone along western boundary, and all associated development and works including surface water, water services and utilities infrastructure including lighting, landscaping and works