Dunnstown and Harristown, Delamain, Co. Kildare
Proposed development
For a proposed renewable energy development to construct a section of underground cabling connecting two parcels of the Permitted Delamain Solar Farm (Planning Reference 23/567/ ABP-318785) replacing a section of permitted cable, located in the townlands of Dunnstown and Harristown Co. Kildare. A c. 1.58km 33kV cross-country underground cable (UGC) with associated joint bays located within agricultural fields and private lands and a section crossing the L6044 local road. All ancillary site works, the planning application seeks a 10-year planning permission. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
21 Sept 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a proposed renewable energy development to construct a section of underground cabling connecting two parcels of the Permitted Delamain Solar Farm (Planning Reference 23/567/ ABP-318785) replacing a section of permitted cable, located in the townlands of Dunnstown and Harristown Co. Kildare. The development will consist of: • A c. 1.58km 33kV cross-country underground cable (UGC) with associated joint bays located within agricultural fields and private lands and a section crossing the L6044 local road. • All ancillary site works The planning application seeks a 10-year planning permission. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
a proposed renewable energy development to construct a section of underground cabling connecting two parcels of the Permitted Delamain Solar Farm (Planning Reference 23/567/ ABP-318785) replacing a section of permitted cable, located in the townlands of Dunnstown and Harristown Co. Kildare. The development will consist of: • A c. 1.58km 33kV cross-country underground cable (UGC) with associated joint bays located within agricultural fields and private lands and a section crossing the L6044 local road. • All ancillary site works The planning application seeks a 10-year planning permission. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
10 Year Planning Permission for a solar farm with a total area of circa 246 hectares in the townlands of Brannockstown, Brownstown, Carnalway, Coghlanstown West, Corbally, Delamain, Dunnstown, Gaganstown, Greenhills, Harristown, Hillsborough, Moorhill and Rochestown in County Kildare. The solar farm will consist of solar photovoltaic panels with a surface area of 1,130,000m2 on ground mounted frames, 40 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 19 no. Ring Main Units, 9 no. weather stations underground electrical ducting and cabling within the development site, private lands and within the L6063, L2032, L6071, R448, L6072, R412, L6074, L6047 and R413 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. stream and drain deck crossings, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via entrances from the R412, R413, L6044, L6047 and L6063. The solar farm will have a maximum export capacity of circa 210 megawatts. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. Part of the proposed development is situated within the demesne land of Harristown House which contains Protected Structures, but no works are proposed to these Protected Structures but no works are proposed to these Protected Structures. Revised by significant Further Information consisting of revised site layout plans to reduce panelled areas in Parcels 1 and 2, relocation of meteorological mast in Parcel 1 and all associated landscaping and ancillary works
(1) Construction of storey and a half extension to side and rear of existing dwelling. (2) Single-storey link extension between dwelling and proposed extension. (3) Alterations and renovations to existing dwelling including, reconfigured floor layout and new doors and window positions to elevations. (4) Decommissioning of original sub-standard septic tank. (5) Installation of new waste water treatment system. (6) And all associated site works
Construction of new entrance to my property.
the construction of a 19.4 sqm extension over ground and first floor levels, to the rear of the existing two-storey dwelling to accommodate a new stairwell, toilet and alterations to the internal layout of the dwelling, also minor alterations to a window to the front elevation of the dwelling, along with all associated site development and facilitating works