Emo Park, Corrig, Ballybrittas
Proposed development
The importation of inert soil and stones to increase ground levels of low-lying lands to improve for agricultural use and all other ancillary site works (including recontouring) to facilitate the development of an area of ca. 4.65ha using the existing site entrance along with all associated site development and facilitating works. Please note that a Natura Impact Statement (NIS) has been prepared and submitted with this application.
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
21 Jan 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at a new (unpaved) hard-standing area to the north-west of the site. The recovery facility provides for the processing / recycling of inert C&D waste (principally solid / reinforced concrete, bricks, ceramics and solid bituminous waste mixtures) using mobile crushing and screening equipment to produce recycled (secondary) aggregate and the use of surrounding hard-standing areas for the external handling and storage of both unprocessed C&D wastes and recycled aggregates. 3. The construction of a portal frame building with roof-mounted solar panels (3,058sqm), (which will accommodate a workshop, offices and staff welfare facilities) with external provision of staff and visitor car-parking and bicycle parking on a concrete paved area to the south-west of the site; 4. Upgrading of the existing site entrance from the R445 Regional Road and internal access road into the site to provide a secure access point and provision of a weighbridge / site office, and wheelwash to facilitate the proposed development; 5. The provision of surface water management infrastructure for the office and concrete paved area to the south-west of the site, including silt traps and hydrocarbon interceptor (Full flow treatment system) attenuation pond for storm runoff, flow control device from Attenuation Pond and and all associated drainage works. 6. Provision of a foul wastewater treatment system at the site to treat all wastewater(s); 7. Landscaping including boundary treatment and fencing and internal hard and soft landscaping at the hardstand areas and proposed building. 8. All ancillary site development works to facilitate the proposed development, including water services, utilities, lighting and other associated infrastructure works and services. A Natura Impact Statement (NIS) will also be submitted to the planning authority with the planning application.
1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at a new (unpaved) hardstanding area to the north-west of the site. The recovery facility provides for the processing / recycling of inert C&D waste (principally solid / reinforced concrete, bricks, ceramics and solid bituminous waste mixtures) using mobile crushing and screening equipment to produce recycled (secondary) aggregate and the use of surrounding hardstanding areas for the external handling and storage of both unprocessed C&D wastes and recycled aggregates. 3. The construction of a portal frame building with roof-mounted solar panels (3,058sqm), (which will accommodate a workshop, offices and staff welfare facilities) with external provision of staff and visitor car-parking and bicycle parking on a concrete paved area to the south-west of the site; 4. Upgrading of the existing site entrance from the R445 Regional Road and internal access road into the site to provide a secure access point and provision of a weighbridge / site office, and wheelwash to facilitate the proposed development; 5. The provision of surface water management infrastructure for the office and concrete paved area to the south-west of the site, including silt traps and hydrocarbon interceptor (Full flow treatment system) attenuation pond for storm runoff, flow control device from Attenuation Pond and and all associated drainage works. 6. Provision of a foul wastewater treatment system at the site to treat all wastewater(s); 7. Landscaping including boundary treatment and fencing and internal hard and soft landscaping at the hardstand areas and proposed building. 8. All ancillary site development works to facilitate the proposed development, including water services, utilities, lighting and other associated infrastructure works and services. A Natura Impact Statement (NIS) will also be submitted to the planning authority with the planning application.
1. Removal of existing scrub and failed plantation and the sequential raising of ground levels across the proposed development site by an average of 1.25m using imported soil and stone comprising both waste and (non-waste) byproduct; 2. Development and operation of a construction and demolition (C&D) waste recovery facility at a new (unpaved) hardstanding area to the north-west of the site. The recovery facility provides for the processing / recycling of inert C&D waste (principally solid / reinforced concrete, bricks, ceramics and solid bituminous waste mixtures) using mobile crushing and screening equipment to produce recycled (secondary) aggregate and the use of surrounding hardstanding areas for the external handling and storage of both unprocessed C&D wastes and recycled aggregates. 3. The construction of a portal frame building with roof-mounted solar panels (3,058sqm), (which will accommodate a workshop, offices and staff welfare facilities) with external provision of staff and visitor car-parking and bicycle parking on a concrete paved area to the south-west of the site; 4. Upgrading of the existing site entrance from the R445 Regional Road and internal access road into the site to provide a secure access point and provision of a weighbridge / site office, and wheelwash to facilitate the proposed development; 5. The provision of surface water management infrastructure for the office and concrete paved area to the south-west of the site, including silt traps and hydrocarbon interceptor (Full flow treatment system) attenuation pond for storm runoff, flow control device from Attenuation Pond and and all associated drainage works. 6. Provision of a foul wastewater treatment system at the site to treat all wastewater(s); 7. Landscaping including boundary treatment and fencing and internal hard and soft landscaping at the hardstand areas and proposed building. 8. All ancillary site development works to facilitate the proposed development, including water services, utilities, lighting and other associated infrastructure works and services. A Natura Impact Statement (NIS) will also be submitted to the planning authority with the planning application.
the importation of inert soil and stones to increase ground levels of low-lying lands to improve for agricultural use and all other ancillary site works (including recontouring) to facilitate the development of an area of ca. 4.65ha using the existing site entrance along with all associated site development and facilitating works. Please note that a Natura Impact Statement (NIS) has been prepared and submitted with this application.
import inert soil and stones to increase ground levels of low-lying lands to improve for agricultural use and all other ancillary site works (including recontouring) to facilitate the development of an area of ca. 4.65ha using the existing site entrance along with all associated site development and facilitating works. An Natura Impact Statement (NIS) has been submitted with this application.
import inert soil and stones to increase ground levels of low-lying lands to improve for agricultural use and all other ancillary site works (including recontouring) to facilitate the development of an area of ca. 4.65ha using the existing site entrance along with all associated site development and facilitating works.