Churchtown, Athy, Co. Kildare
Proposed development
A new bungalow containing 3 bedrooms, kitchen/dining, utility, living room, bathroom on ground floor and bed 4 with study and family spaces in the attic. This application is also to include a new entrance from the public road and all ancillary site works, retention of a currently certified Envirocare drainage system, retention of the applicants mobile home on the site and its removal upon completion of construction of the proposed bungalow
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 28 Oct 2026
- Residential units
- 1
- Floor area
- 242 m²
Timeline
Application received
3 Sept 2026
Decision due
28 Oct 2026
Decision: refused
22 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a change of design to a 4 bedroom bungalow containing 3 bedrooms, kitchen/dining, utility, living room, bathroom on ground floor and bed 4 with study and family spaces in the attic on a previously approved site containing an Envirocare P12 drainage system
Change of design to 4 bedroom bungalow containing 3 bedrooms, kitchen/dining utility, living room, bathroom on ground floor and bedroom with study and family spaces in the attic on a previously approved site containing an Envirocare P12 drainage system.
permission to construct a Soiled water / Slurry lagoon, Planning permission to erect a meal storage bin and associated site work
Extension of Duration of 08/48 comprising construction of a storey and a half type dwelling, garage and to install a mechanical aeration unit and soil polishing filter and all ancillary site works
A. Constructing a part single storey, part 2 storey dwelling, B. Constructing a single storey garage C. Installation of a new wastewater treatment system & polishing filter D. Construction of a new vehicular entrance and all ancillary site works
Extension of Duration of Planning Ref. 16/1007 - a temporary (27 years) ground-mounted solar photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works