Ardrass Upper, Celbridge, Co. Kildare
Proposed development
• Construction of two new sheds and yards for the storage of waste materials; • Construction of a workshop shed to support maintenance and operations; • Provision of a welfare facility including a canteen, toilet and office building, along with the installation of a septic tank and percolation area; • Provision of a Security Kiosk at the site entrance; Other onsite facilities includes: o Wheelwash area; o Weighbridge, Inspection and quarantine area; o Proposed Storage yard; and o Fencing, lighting, upgrade of existing access roadway and hardcore area, drainage, pipework including gully’s, sediment traps and hydrocarbon interceptor and all other ancillary works. o Trimming of hedgerows and the removal of c. 55metres of hedgerow along the eastern side of the road to the north of the site entrance and replacement with new hedgerow or timber fencing to provide adequate sightline. The principal activities associated with the proposed development are;• Change of use of the existing agricultural shed into a waste processing building; • An annual intake of up to 25,000 tonnes of Construction & Demolition (C&D), Green and inert waste; Processing of C&D, Green and inert wastes including: o Crushing and recycling of concrete and bricks into secondary aggregates; o Screening and cleaning of soil & stones for reuse; o Separation of Metals & Woods for reuse or recycling; and o shredding and storage for composting of green waste for reuse and recycling. Part of the operational phase of the proposed project includes the reuse of the processed C&D, green and inert wastes which will be hauled off site by HGV to their destination. The proposed development includes activities that will require a Waste Facility Permit from the Local Authority under the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended)
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 4 Feb 2026
Timeline
Application received
2 Dec 2025
Decision due
4 Feb 2026
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
relocate existing vehicular access and for the removal of existing trees and hedging to provide improved sightlines together with 1.8 meter high boundary wall set back from road edge together with associated site works
• Construction of two new sheds and yards for the storage of waste materials; • Construction of a workshop shed to support maintenance and operations; • Provision of a welfare facility including a canteen, toilet and office building, along with the installation of a septic tank and percolation area; • Provision of a Security Kiosk at the site entrance; • Other onsite facilities includes: Wheelwash area; Weighbridge, Inspection and quarantine area; Proposed Storage yard; and Fencing, lighting, upgrade of existing access roadway and hardcore area, drainage, pipework including gully’s, sediment traps and hydrocarbon interceptor and all other ancillary works. Trimming of hedgerows and the removal of c. 55metres of hedgerow along the eastern side of the road to the north of the site entrance and replacement with new hedgerow or timber fencing to provide adequate sightline. The principal activities associated with the proposed development are; Change of use of the existing agricultural shed into a waste processing building; An annual intake of up to 25,000 tonnes of Construction & Demolition (C&D), Green and inert waste; Processing of C&D, Green and inert wastes including: Crushing and recycling of concrete and bricks into secondary aggregates; Screening and cleaning of soil & stones for reuse; Separation of Metals & Woods for reuse or recycling; and Shredding and storage for composting of green waste for reuse and recycling. Part of the operational phase of the proposed project includes the reuse of the processed C&D, green and inert wastes which will be hauled off site by HGV to their destination. The proposed development includes activities that will require a Waste Facility Permit from the Local Authority under the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended)
to relocate existing vehicular access and for the removal of existing trees and hedging to provide improved sightlines together with 1.8 meter high boundary wall set back from road edge together with associated site works
a fenced dog run area for the public access of exercising dogs and all ancillary site works to include driveway from existing entrance
The development will consist of an enclosed (fenced) area of one acre and associated groundworks for public access for the purpose of dogs exercising.
(1) Construction of 1 no. two–storey five-bedroom farmhouse (including farm / home office) with adjoining single storey garage connected via single–storey bootroom to be served by 1 no. new vehicular access from Lovers Lane / Ardrass Road, proprietary wastewater treatment system / percolation area and private bored well ( potable water supply): (2) construction of farmyard complex with associated farm access roads to serve overall livestock farm of 62.33 hectares (154 acres) comprising; (a) 1 no. cubicle shed with loose bedding area for the housing of cattle, storage area and underground effluent tanks with solar panels provided on the southern roof elevation of the building; and (b) 1 no. concrete apron incorporating 2 no. silage pits; (3) construction of 1 no. 16m wind turbine; and (4) all ancillary works necessary to facilitate the development include SuDS water drainage, landscaping and boundary works