2 Dara Park, Kildare Town, Co. Kildare
Proposed development
For (A) Retention Permission for conversion of existing garage (15sqm) into a playroom to the Front (south east) elevation, (B) Two storey extension to Front (south east) elevation & Side (south west) elevation, over the existing single storey part and alterations to the front porch
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 21 Jan 2026
Timeline
Application received
18 Nov 2025
Decision due
21 Jan 2026
Decision: conditional
19 Jan 2026
Grant issued
24 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the use of an existing detached structure as a standalone one-bedroom dwelling together with permission for associated site works including the provision of a defined curtilage, private open space, parking and boundary treatments at 1262 Campion Crescent, Kildare Town, Co. Kildare R51 XR20
the construction of single storey rear extension to a mid-terrace cottage to form a 3 bedroom dwelling, which will incorporate part of the existing rear attached garage (remaining existing garage to be demolished), associated alterations to all elevations, foul water to existing foul sewer, surface water to soakaways, and all associated site works
(I) The provision of 46no. two storey dwellings which will comprise 46no. 3bed units. (II) The provision of 12no. duplex apartment units which will comprise 2no. 1bed units, 6no. 2bed units and 4no. 3bed units. The duplex apartment buildings range in height from part single storey, part two storey and part three storey in height. (III) The provision of a bin and bicycle storage building for duplex apartment units along with 2no. bin storage buildings. (IV) The provision of associated surface level car parking for residents and visitors. (V) The provision of associated internal roads and footpaths along with connections made to the wider Magee Quarter site as currently under construction. (VI) The provision of associated site services to include for foul, water and surface water infrastructure works. (VII) Provision of associated site landscaping works to include for provision of a Multi Use Games area, Public Open Space, Communal Space area along with street lighting. (VIII) Provision of associated boundary treatments to include for pedestrian connectivity onto Curragh Road
Extension of Duration of 21/261 which consists of a single storey, Child Development Centre, containing therapy and meeting rooms, staff offices and canteen, group training room, retail shop, external play areas, covered walkways and sensory garden, art installations, lit signage, carparking, bin store, plant, acoustic screen, new masonry boundary walls and all associated siteworks and landscaping
works to a Protected Structure, comprising the installation of new timber sash windows and doors to match the period character of the building; lime-rendered and pebble-dashed façade; construction of a new cut roof with reclaimed natural slate to match existing; painted timber fascia and soffit; half-round cast iron gutters and downpipes; renovation and refurbishment of the existing structure; and all associated works. The works will be carried out using traditional materials and detailing appropriate to the character of the Protected Structure and in compliance with current Building Regulations. This application follows a determination under Section 57 of the Planning and Development Act 2000 (as amended), which concluded that the proposed works would materially affect the character of the Protected Structure and therefore require planning permission. The dwelling is included on the Record of Protected Structures (RPS) for County Kildare under RPS Ref. No. B22-21 (No. 19 Fairview Cottages, Kildare, Co. Kildare).
(1) Partial demolition of rear roof of the existing derelict buildings along Bride Street (former stables buildings/vacant commercial units) and full demolition of the derelict storage building to the rear of the site; (2) Internal renovation and extension to rear to accommodate 5no. apartments and construction of two-storey replacement building to accommodate 2 no. apartments (a combined total of 7 no. apartments all at ground and first floor level); (3) Restoration and repair of the street-facing facades along Bride Street; (4) Provision of a communal courtyard for use of the apartments; (5) All associated works to include landscaping, boundary treatments, infrastructure, lighting, foul / surface drainage and site works necessary to facilitate the development.