Griffinrath, Celbridge, Co. Kildare
Proposed development
For a two storey house, septic tank and percolation area, combined recessed entrance and all associated siteworks
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 14 Jun 2026
- Residential units
- 1
- Floor area
- 276 m²
Timeline
Application received
2 Oct 2025
Council asked for further information
25 Nov 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
18 May 2026
Decision due
14 Jun 2026
Decision: conditional
11 Jun 2026
Grant issued
17 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for a change of house type only on a permission granted to me under planning reference number 2561118. It is proposed to construct a traditional style 2 storey house. The house will be orientated with its front line parallel to the public road. All other aspects of the application to be as per granted under 2561118. All of the above on our site at Griffinrath, Celbridge, Co. Kildare.
for a two storey house, septic tank and percolation area, combined recessed entrance and all associated siteworks
for a two storey house, septic tank and percolation area, combined recessed entrance and all associated siteworks. Revised by Significant Further Information which consists of: New effluent treatment system and polishing filter to replace the proposed septic tank and percolation area
application for a 10 year permission for development on lands in the townland of Griffinrath, Celbridge. The development will consist of the construction of a solar PV farm with an operational life of 35 years comprising approximately 75,984 No. photovoltaic panels on ground mounted frames within a site area of 44.21 hectares and associated ancillary development including 10 No. transformer stations, approximately 124 No. string-inverters, 1 No. onsite 38kV substation building, 1 No. 40ft storage container building, 7 No. CCTV security cameras mounted on 4 metre high poles and perimeter security fencing (2 metres high), the construction of an internal hardcore access road between the solar panels and the site access, localised improvements to an existing agricultural access from the adjoining L5065 road to facilitate construction and operational phase access and, the installation of a 38kV underground electricity cable from the onsite 38kV substation to the 110kV Griffinrath substation ca. 0.75km to the southeast. A Natura Impact Statement has been prepared in respect of the proposed development. Revised by Significant Further Information which consists of an Aviation Glint and Glare Assessment Report, an Archaeological Report; an amended Noise and Vibration Impact Assessment; a Traffic Report; drawings of cable locations and trench reinstatement and road closures and road diversion routes; a Stage 1/2 Road Safety Audit; updated drawings of the existing and proposed entrance and the proposed compound and temporary set down area; and a risk assessment of the hazards associated with a fire in or near the solar arrays.
the renovation of an existing house, to raise the eave level, provide new wastewater treatment system and all necessary ancillary site works on my land, Previous permission 05/2283, all at
the renovation of an existing house, to raise the eave level, provide new wastewater treatment system and all necessary ancillary site works on my land. Previous permission 05/2283,