Barrogstown, Maynooth, Co. Kildare
Proposed development
For the sub-division of existing family site for the construction of a single storey bungalow, single storey detached domestic garage, utilisation of family entrance, secondary effluent treatment system and all associated site works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 12 Oct 2025
- Residential units
- 1
- Floor area
- 266 m²
Timeline
Application received
18 Aug 2025
Decision due
12 Oct 2025
Decision: refused
9 Oct 2025
Grant issued
18 Mar 2026
Appeal decided: conditional (PL-500219-KE)
18 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
PERMISSION FOR THE SUB-DIVISION OF EXISTING SITE TO ALLOW FOR THE CONSTRUCTION OF A DETACHED DORMER STYLE HOUSE WITH SINGLE STOREY ELEMENT, SINGLE STOREY DETACHED DOMESTIC GARAGE, UTILISATION OF PREVIOUSLY PERMITTED RECESSSED ENTRANCE FOR LAUREN O HAGAN (PLANNING REF 2560140) AS SHARED ENTRANCE, RELOCATION OF PREVIOSULY PERMITTED SECONDARY EFFLUENT TREATMENT SYSTEM FOR LAUREN O HAGAN TO ACCOMMODATE THE DEVELOPMENT AND ALL ASSOCIATED SITE WORKS.
A) The part demolition of the existing dwelling structure, including the removal of the rear two storey lean-to and the single storey side extension annex, B) A part single-storey, part two-storey extension including an indoor pool and gym to the side and rear of the existing two storey dwelling comprising a total extension area of 669.1sqm, C) The construction of a 3 carport garage with storage to first floor level above (107sqm), D) Replacement of existing septic tank with a proposed new Waste Water Treatment System and associated percolation area, E) Associated pool filters and drainage systems, F) Modifications to existing site entrance, G) As well as all associated internal and external alterations and site development works
Permission is sought by Ray Crofton Ltd. for the following: (1.) Construction of a single storey extension to the sides and rear of the existing showroom and service area to extend the existing service area and provide new valeting, servicing office space, canteen and new toilet facilities. (2.) The demolition of the existing single storey valeting shed to allow for the above extension. (3.) Two storey extension to each side of the existing showroom comprising additional showroom area, canteen and office spaces. (4.) The change of use of the existing 3 bedroom with study dormer bungalow to offices, conference room, canteen and storage spaces. (5.) The provision of additional car display and storage areas to the front and side of the existing dormer dwelling. (6.) The erection of new advertising on the roof of the new proposed extension facing the M4 motorway. (7.) The relocation of the existing pylon sign to the front of the existing showrooms and the rebranding of all existing onsite signage. (8.) The erection of new security entrance and exit gates along with new security boundary fencing involving the removal of the existing entrances, boundary wall and hedging to the front of the existing dwelling seeking a change of use. All the above along with all other associated landscaping and ancillary site development works on their lands at Ballygoran, Celbridge Road, Maynooth, Co. Kildare.
for 1) Retention of an existing single storey extension to an existing dwelling 2) a domestic single storey extension to an existing dwelling
for 1) Retention of an existing single storey extension to an existing dwelling 2) a domestic single storey extension to an existing dwelling
for the construction of a detached dormer style house with single storey element, single storey detached domestic garage, recessed entrance, secondary effluent treatment system and all associated site works. Revised by Significant Further Information which consists of relocation of proposed entrance, amendments to the proposed house type and relocation of secondary effluent treatment system and all associated site works