9 Aylesbury Park, Newbridge, Co. Kildare
Proposed development
For single storey extension to side of existing house – side garden area
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 8 Sept 2025
Timeline
Application received
15 Jul 2025
Decision due
8 Sept 2025
Decision: conditional
8 Sept 2025
Grant issued
23 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
proposed two storey extension over the existing single storey shop to form a one bedroom apartment with private garden on first floor with its own front door access on ground floor including onsite car parking / carport and refuse storage and all associates site works
for; 1) Single storey extension with 2no. roof windows to the rear of existing dwelling and kitchen window to the side. 2) Conversion of existing attic space comprising modification of existing roof structure, dormer window to the rear, new access stairs, 3no. roof windows to the front of exiting dwelling and all associated site works
Planning Permission for; 1) Single storey extension with 2no. roof windows to the rear of existing dwelling and kitchen window to the side. 2) Conversion of existing attic space comprising modification of existing roof structure, dormer window to the rear, new access stairs, 3no. roof windows to the front of exiting dwelling and all associated site works
a dormer / two storey extension to the rear of an end of terrace, single storey dwelling, including dormer accommodation in the roof space of the existing dwelling, associated alterations to the Front, Side & Rear elevations, demolition of existing garage structure and all ancillary site works
The development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks (to replace an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to both ends of the hockey pitch plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch plus the provision of dug outs/player shelters, a viewing area with 1.2m high & 0.6m high spectator rail and storage containers to serve the new pitch, • the construction of 1no. new synthetic/all-weather floodlit rugby pitch and all associated siteworks (in place of part of an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to eastern perimeter of pitch, 3m high perimeter fencing plus 12m high ball stop netting (total 15m overall) to western perimeter of pitch adjacent to River Liffey plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch to serve the new rugby pitch and also floodlights on the same lighting columns to light the existing grass pitch adjacent to the new all-weather rugby pitch plus the provision of dug outs/player shelters, a spectator viewing area with tiered steps with 1.2m high & 0.6m high spectator rail at pitch edge and storage containers to serve the new pitch, • the construction of a new path from the end of the existing private bridge over the River Liffey to the pitches to include 8no. new 5m high lighting columns with lighting and all associated siteworks to facilitate access to the new all-weather pitches, • together with all associated development siteworks related to the entire development. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2023-2029
for a) The construction of a single storey dwelling with a floor area of 151.1 m²; b) The provision of a new wastewater treatment plant and associated tertiary treatment filter; c) Site access being provided off the existing recessed entrance serving the parental home; and d) All associated site development works