Cockpit Lane, Ballitore, Co. Kildare
Proposed development
To construct 4 No. two storey semi detached dwellings, form connections to public services including foul water sewer, surface water sewer and water mains, including new boundary treatments, construct new vehicular entrances with all ancillary services and associated site works at
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
- Residential units
- 4
- Floor area
- 610 m²
Timeline
Application received
26 Jun 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
demolition of small single storey extension consisting of kitchen, construction of new rear extension consisting of kitchen, utility, bedroom and ensuite on ground floor with mezzanine floor over kitchen area. Alterations to front facade to include change of position and shape of front door and windows
demolition of small single storey extension consisting of kitchen, construction of new rear extension consisting of kitchen, utility, bedroom and ensuite on ground floor with mezzanine floor over kitchen area. Alterations to front facade to include change of position and shape of front door and windows
The development consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works
for to construct 4 No. two storey semi detached dwellings, form connections to public services including foul water sewer, surface water sewer and water mains, including new boundary treatments, construct new vehicular entrances with all ancillary services and associated site works