Ballitore, Athy, Co. Kildare
Proposed development
For constructing 8 No. dwellings consisting of 2 No. detached 2-storey houses and 2 No. 2-storey terrace blocks consisting of 3 No. houses each. The development also consists of individual domestic vehicular entrances off Abbeyfield and Mill Lane, new shared cycle / footpath along Mill Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: The principal amendments to the original scheme entail 1) revised site layout including revised access arrangements; 2) revised building designs; 3) revised landscaping and boundary treatments; and 4) revised location of cycle path
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 17 May 2026
- Residential units
- 8
- Floor area
- 980 m²
Timeline
Application received
9 Jun 2025
Council asked for further information
31 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
20 Apr 2026
Decision due
17 May 2026
Decision: conditional
14 May 2026
Grant issued
19 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
demolition of small single storey extension consisting of kitchen, construction of new rear extension consisting of kitchen, utility, bedroom and ensuite on ground floor with mezzanine floor over kitchen area. Alterations to front facade to include change of position and shape of front door and windows
demolition of small single storey extension consisting of kitchen, construction of new rear extension consisting of kitchen, utility, bedroom and ensuite on ground floor with mezzanine floor over kitchen area. Alterations to front facade to include change of position and shape of front door and windows
The development consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
domestic garage as constructed and all associated site works.
domestic garage as constructed and all associated site works.