Allenwood Middle, Allenwood, Naas
Proposed development
For (a) extension to the existing funeral home, (b) to include storage space at first floor level, (c) to include office space, tea station, and wake room at ground floor level (d) one single commercial unit, 48m2 with external shop front signage, (e) foul and surface water connections to existing public mains, (f) provide designated parking within an existing car park at rear, accessed by an existing entrance and (g) all associated site works. Revised by Significant Further Information which consists of: (a) Retention of the existing funeral home. (b) Rear car parking arrangement
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 15 Sept 2025
Timeline
Application received
26 May 2025
Council asked for further information
17 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
19 Aug 2025
Decision due
15 Sept 2025
Decision: conditional
11 Sept 2025
Grant issued
23 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consists of demolition of existing front-side garden wall; change of use of part of the existing detached garage to provide a sauna room with toilet and shower facilities; extension of the existing garage to be a habitable accommodation to provide a home office (12.5 sq.m); and all associated site works.
for the demolition of existing front-side garden wall; change of use of part of the existing detached garage to provide a sauna room with toilet and shower facilities; extension of the existing garage to be a habitable accommodation to provide a home office and all associated site works.
of planning ref no. 20/835 which consists of: (A) Construction of 10 no. one and a half storey detached 4-bedroom houses. (B) Installation of foul water pumping station to connect to manhole currently under construction as part of the adjoining approved residential development which connects to the public foul sewer under planning file ref 17/120. (C) New 6m wide access road and cycle path with 1m grass verge and 2m footpath to join with access road currently under construction as part of adjoining approved residential development under planning file ref 17/120. (D) Provision of landscaped public open spaces with cycle and pedestrian link to the south boundary for future connection to the Grand Canal towpath through future linear park and all associated site development works
Retention permission for an existing earth berm, and peripheral of site and associated landscaping works and existing surface water drainage layout, together with all ancillary site works.
The development will consist of demolition of both existing boiler house buildings, the construction of a two storey extension to the front school building with a total floor area of 994.8 m2 comprising a 2 classroom SEN Unit, 3 no. en-suite classrooms, staff room, sanitary facilities, ancillary and service rooms, alterations to front school building to comprise the demolition an existing porch, the provision of a new roof light to existing kitchen, and other minor alterations to facilitate connection with proposed extension alterations to rear school building to comprise the amalgamation of two smaller classrooms to create one larger classroom, and the reconfiguration of an existing kitchen to be repurposed as a plant room including minor changes to the elevation, 5) alterations to outdoor play areas comprising the provision of Secure SEN Play Area and Sensory Garden, the removal of existing “Astroturf” play area and replacement with new “astroturf” play area to the north of the site, and provision of new hard surface play areas to the west and south of the rear building, provision of new internal road including the construction of a new vehicular entrance from the church grounds, and the provision of set down area and 6 no. parking spaces to serve the SEN Unit, provision of 24 no. covered bicycle parking spaces, provision of new LPG gas compound and Heat Pump compound, installation of solar panels to proposed extension roof, all associated drainage & site development works.
demolition of all existing structures on the site and the construction of a two storey Community Care Support & Training Facility. Also, associated works including the provision of a new public footpath to the front of the site, widening of the existing vehicular entrance, provision of a pedestrian entrance, provision of car parking, lighting, landscaping, boundary treatment and all associated infrastructure, site works and services. For clarity there is no residential care element proposed as part of the proposed development.