Ballycullane, Athy, Co. Kildare
Proposed development
For the demolition of 3 no. existing agricultural sheds and construction of 2 new agricultural storage sheds, 2 no. screening bins and associated dryers, hoppers and all ancillary site works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 25 Nov 2025
Timeline
Application received
15 May 2025
Council asked for further information
7 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
29 Oct 2025
Decision due
25 Nov 2025
Decision: conditional
20 Nov 2025
Grant issued
22 Dec 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a) Constructing a part single storey and part 2 storey dwelling; (b) Constructing a detached single storey garage and home office; (c) Installation of a new waste water treatment system; (d) Constructing a new vehicular access and all ancillary site works. Significant further information of A. a revised site layout plan which includes the re-location of the proposed dwelling, B. reduction in floor area and relocation of detached garage/home office and C. relocation of wastewater treatment system.
development will consist of: (a) The retention of the existing sheds and pump-house structures along the southern boundary. (b) The conversion of the existing shed structure. (c) The construction of a new single storey flat roof extension link to the side along the southern boundary to link the existing house to the proposed converted shed structure. (d) The alteration of the existing porch structure to the front. (e) The construction of a two-storey high glazed unit to the rear elevation with a roof return. (f) The removal of the existing dormer structure and roolight to the rear return and construction of a new ridgeline rooflight. (g) The construction of a new zinc box dormer at first floor level to the rear. (h) The alteration of the existing dormer structure to the front. (i) The construction of a new first floor extension to the side along the northern boundary. (j) The alteration/s of the existing turret roof and supporting walls including increase of height. (k) Elevational alterations to the dwelling. (l) New wastewater treatment plant and associated works
development will consist of: (a) The retention of the existing sheds and pump- house structures along the southern boundary. (b) The conversion of the existing shed structure. (c) The construction of a new single storey flat roof extension link to the side along the southern boundary to link the existing house to the proposed converted shed structure. (d) The alteration of the existing porch structure to the front. (e) The construction of a two-storey high glazed unit to the rear elevation with a roof return. (f) The removal of the existing dormer structure and roolight to the rear return and construction of a new ridgeline rooflight. (g) The construction of a new zinc box dormer at first floor level to the rear. (h) The alteration of the existing dormer structure to the front. (i) The construction of a new first floor extension to the side along the northern boundary. (j) The alteration/s of the existing turret roof and support walls including increase of height. (k) Elevational alterations to the dwelling. (l) New wastewater treatment plant and associated works
(A) The demolition of the existing single-storey extension to the rear; (B) The conversion of the existing shed structure with the installation of solar panels to the roof structure; (C) The construction of a new single storey flat roof extension link to the side along the southern boundary to link the existing house to the proposed converted shed structure; (D) The alteration of the existing porch structure to the front; (E) The construction of a two-storey high glazed unit to the rear elevation with a roof return; (F) The removal of the existing dormer structure and rooflight to the rear return and construction of a new ridgeline rooflight; (G) The construction of a new zinc box dormer at first-floor level to the rear; (H) The alteration of the existing dormer structure to the front; (I) The construction of a new first floor extension to the side along the northern boundary; (J) The alteration/s of the existing turret roof and supporting walls including increase of height; (K) Elevational alterations to the dwelling
A: The demolition of the existing single-storey extension to the rear, B: The conversion of the existing shed structure with the installation of solar panels to the roof structure, C: The construction of a new single storey flat roof extension link to the side along the southern boundary to link the existing house to the proposed converted shed structure, D: The alteration of the existing porch structure to the front, E: The construction of a two-storey high glazed unit to the rear elevation with a roof return, F: The removal of the existing dormer structure & rooflight to the rear return and construction of a new ridgeline rooflight, G: The construction of a new zinc box dormer at first-floor level to the rear, H: The alteration of the existing dormer structure to the front, I: The construction of a new first floor extension to the side along the northern boundary, J: The alteration/s of the existing turret roof & supporting walls including increase of height, K: Elevational alterations to the dwelling,