Mayfield, Monasterevin, Co. Kildare
Proposed development
For the construction of two no. single storey distribution warehouses, each with associated two storey office and service areas with an overall gross floor area of 9,171.8sqm that will comprise of the following: Construction of a single storey distribution warehouse A that will have a gross floor area of 4,436.6sqm that will include a single storey goods receiving area / store and ancillary spaces of 3,869.6sqm with PV panels and rooflights above, as well as an adjoined two storey office / administrative block of 567sqm with green roof attached to its north-east corner. Construction of a single storey distribution warehouse B that will have a gross floor area of 4,735.2sqm that will include a single storey goods receiving area / store and ancillary spaces of 4,182.8sqm with PV panels and rooflights above, as well as an adjoined two storey office / administrative block of 552.4sqm with green roof attached to its north-west corner. A new vehicular entrance into the site off the L81760, including works to the public road, with new internal access road that will provide access to 81 no. new car parking spaces (including 5 no. electric and 4 no. disabled spaces); 8 no. motorbike spaces; and 80 no. bicycle stands to serve the overall development. An ESB substation, 2 no. waste water treatment plants (one for each warehouse), an attenuation basin and connections to existing infrastructural services, fencing and signage as well as all ancillary site development works that will include new planting and landscaping to all boundaries
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 18 May 2025
Timeline
Application received
24 Mar 2025
Decision due
18 May 2025
Decision: refused
14 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of permission for reconfiguration of part of the existing parking area to provide additional EV parking spaces and infrastructure for cars, buses and HGVs and will involve modifications to the circulation areas for vehicles and pedestrians and the provision of an additional 68no. car parking spaces. The overall parking provision at Junction 14 Mayfield will be modified to increase car parking spaces from 270no. to 338no., reduce HGV parking spaces from 41no. to 39no. and no change to the number of bus parking spaces (11no. spaces) and services bays (2no spaces). The overall parking provision will include 29no. EV car parking spaces, 2no. EV HGV parking spaces and 2no. EV bus parking spaces. Permission is also sought for all associated modifications to hard and soft landscaping, 2no. ESB substations, 4no. AC power cabinets, an overhead canopy above the EV car parking spaces, an acoustic perimeter fence along the eastern boundary of the site, site lighting, signage and all associated site and development works. Retention permission is also sought for the existing dog park (271sq.m)
to extend the existing permitted 24m high lattice telecommunications structure, granted permission under Planning Ref: 221113, by an additional 6m (to an overall height of 30m), together with the addition of antennas, dishes and associated telecommunications equipment all within the existing telecommunications site compound
Of (19/361) which consists of (a) Agricultural shed/stables, lunge ring and walking ring; and (b) Removal/demolition of existing storage building, stables building, lunge ring and walking ring using existing vehicular entrance and all associated site works
1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus charging bays, and 2no. electric vehicle truck charging bays, each comprising a parking space and electric vehicle charging unit; 2. Installation of 59no. staff car parking spaces and relocation of 17no. truck parking spaces; 3. Installation of 10no. electric vehicle power unit’s c/w 2.0m high palisade fence enclosure; 4. Construction of extension to the existing ESB substation building (24sq.m); 5. Site development works to include the following, installation of 1no. covered bicycle parking area, 1no. covered smoking shelter, construction of 2no. dog walking tracks, acoustic perimeter fencing, site lighting, precast kerbing, surfacing, landscaping, and all associated drainage works
for 1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus charging bays, and 2no. electric vehicle truck charging bays, each comprising a parking space and electric vehicle charging unit; 2. Installation of 59no. staff car parking spaces and relocation of 17no. truck parking spaces; 3. Installation of 10no. electric vehicle power unit’s c/w 2.0m high palisade fence enclosure; 4. Construction of extension to the existing ESB substation building (24sq.m); 5. Site development works to include the following, installation of 1no. covered bicycle parking area, 1no. covered smoking shelter, construction of 2no. dog walking tracks, acoustic perimeter fencing, site lighting, precast kerbing, surfacing, landscaping, and all associated drainage works.
to erect a 24m high lattice telecommunications structure together with antennas, dishes and associated telecommunications equipment, all enclosed by security fencing and extend existing access track