Glasshely, Ballitore, Co. Kildare
Proposed development
Of a domestic garage and a storage shed on the rear of the existing house
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 8 May 2025
Timeline
Application received
14 Mar 2025
Decision due
8 May 2025
Decision: conditional
8 May 2025
Grant issued
20 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1) Carry out alterations to the front elevation to include (a) altering window sizes to create a balanced elevation. (b) removal of a chimney which appears on the right-hand side when viewed from the public road 2) Carry out a single storey extension to the rear. Part of this extension will be seen from the front elevation. 3) Decommission and upgrade the existing septic tank system to a Secondary Sewage Treatment System with a Soil Polishing Filter. 4) Remove the existing old garage. 5) All ancillary sites work in association with the above. The existing cottage has a floor area of 59.01 sq.m. The proposed extension will add a further 118.24 sq.m
of a domestic garage and a storage shed on the rear of the existing house
of a domestic garage and a storage shed on the rear of the existing house
alterations to dwelling under construction (Planning Reference 20/522). Alterations include revisions to external window sizes, additional floor areas to side (in two separate locations) and all associated site works
(a) Retention of extension to the rear of existing dwelling; (b) Retention of conversion of attic to habitable space and (c) Permission to replace existing septic tank with new septic tank and percolation area and all ancillary site developments
(a) retention of extension to the rear of existing dwelling, (b) conversion of attic to habitable space and (c) permission to replace existing septic tank with new septic tank and percolation area and all ancillary site developments